Browse
Search
2001 NS Housing - Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2001
>
2001 NS Housing - Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2012 3:57:01 PM
Creation date
5/31/2012 11:56:39 AM
Metadata
Fields
Template:
BOCC
Date
3/6/2001
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8g
Document Relationships
Agenda - 03-06-2001-8g
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 03-06-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Delores Mason 4 <br />336 McMasters St. Chapel Hill <br />942 -8913 <br />August 14, 2000 <br />EXTERIOR <br />Pressure wash the exterior siding, trim, shutters, and block. Prepare all surfaces for paint. <br />Paint the block, trim, doors, siding and rear porch ceiling with exterior latex paint. <br />Prepare the handrails for paint. Paint the handrails with an oil primer and an oil base <br />paint. Stain the rear deck and handrails with an oil stain and sealer. <br />2. Secure the front porch railing to the house. <br />3. Replace the foundation vents with louvered foundation vents. <br />4. Repair the front steps. <br />5. Install vinyl gutter guard on the front and rear gutters. <br />6. Install elbows at the rear downspouts and install a plastic splashblock under each <br />downspout. Replace the left/rear downspout. <br />7. Remove the oil tank. <br />8. Expose the front footer 24 inches from the house. Install Dry Lock waterproofing from <br />the footer to the yard height. Install #6 crushed stone and perforated drainpipe to run 15 <br />feet past the left end of the house. Connect the front downspouts to solid drainpipe to run <br />next to the perforated drainpipe. Cover the drainpipe with landscape fabric and #6 <br />crushed stone. Cover the stone with dirt from the removal. Seed and straw all disturbed <br />surfaces. <br />INTERIOR <br />LIVING ROOM AND HALLWAY: <br />1. Remove the existing front door unit and storm door. Install a six panel, metal insulated <br />door unit with eight -inch jambs, weatherstripping and threshold. Install a lockset and <br />dead bolt to be keyed the same. Install a wide view peephole. Install matching casing. <br />2. Install an aluminum storm door with pneumatic closure and vinyl sweep. Door to have <br />self - storing glass and screen, push button lock and key and lifetime warranty. <br />
The URL can be used to link to this page
Your browser does not support the video tag.