Browse
Search
2012-112 AMS - Clarion Associates LLC - Southern Master Plan Clarion Associates LLC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-112 AMS - Clarion Associates LLC - Southern Master Plan Clarion Associates LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2015 9:21:06 AM
Creation date
5/29/2012 10:55:01 AM
Metadata
Fields
Template:
BOCC
Date
5/15/2012
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
5k
Document Relationships
2012-112 S AMS - Clarion Associates LLS for SHSC Master Plan $110,000
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
Agenda - 05-15-2012 - 5k
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 05-15-2012 - Regular Mtg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• gee <br />3 <br />C IL A R 1 O N <br />258) in Currituck, NC. Phase I includes an Aviation School, soccer fields, <br />commerce park, YMCA with a senior center, and existing facilities such <br />as NC Cooperative Extension Service's Building, Central Elementary <br />School, and the Currituck Head Start Center. Phase II includes <br />expanding the commerce park, constructing new facilities for the <br />Currituck County Animal Center, and relocating Maple Park including <br />ba: eball fields, softball fields, skate park, and equestrian trails. Phase II <br />will also close Airport Road resulting in the rerouting of traffic and/or <br />relocation of existing facilities on Airport Road including the Currituck <br />La idfill Transfer Station and NC Forestry Service County Headquarters. <br />Traffic analyses and simulation modeling were performed for both <br />Phases of development and recommendations to accommodate the <br />forecasted traffic internal to the site, including a roundabout, and along <br />US 258 were provided. <br />M 3rris Grove Elementary School Traffic Impact Analysis and Roundabout Design <br />Chapel Hill - Carrboro City Schools / Carrboro, North Carolina <br />Client Reference: Bill Mullin — (919) 967 -8211, ext. 28221 <br />Or behalf of Chapel Hill - Carrboro City Schools, M/A/B prepared a TIA <br />for the newly constructed Morris Grove Elementary School and future <br />Middle School #6 proposed along Eubanks Road in northern Carrboro. <br />Based on a request by the Town of Carrboro, four build -out scenarios <br />were analyzed to evaluate the individual impact of the elementary and <br />middle schools as well as the potential traffic benefit of building a future <br />connector road through the school site. The recommended intersection <br />treatment was a single -lane roundabout for the intersection of the future <br />conmector road and Eubanks Road to provide superlative traffic <br />op .-rations and to control travel speeds near the school site on Eubanks <br />Road. Traffic simulation was performed utilizing VISSIM software to <br />model future traffic conditions with the schools in place and traffic <br />diversion due to the connector roadway, while also accommodating <br />significant truck traffic along Eubanks Road. M /A/B provided the <br />Ruictional design for the roundabout, including critical elements such as <br />the inscribed diameter, lane widths sidewalk locations, bike lane <br />Sc uthern Orange Campus Master Plan <br />treatments, <br />splitter <br />islands, <br />and apron <br />design. <br />Page 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.