Browse
Search
2012-112 AMS - Clarion Associates LLC - Southern Master Plan Clarion Associates LLC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-112 AMS - Clarion Associates LLC - Southern Master Plan Clarion Associates LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2015 9:21:06 AM
Creation date
5/29/2012 10:55:01 AM
Metadata
Fields
Template:
BOCC
Date
5/15/2012
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
5k
Document Relationships
2012-112 S AMS - Clarion Associates LLS for SHSC Master Plan $110,000
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
Agenda - 05-15-2012 - 5k
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 05-15-2012 - Regular Mtg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
®,a <br />• Caa <br />C 1t A R 1 0 N <br />With respect to transportation planning, emphasis on multi -modal <br />systems, and attention to realistic traffic impact assessment, we are proud <br />to have Martin/Alexiou/Bryson as a key member of this consultant team. <br />M /A/B also has a wealth of experience and success to bring to this <br />project, as highlighted below. <br />Relevant Project Experience <br />M/A/B has worked with more than 50 universities and colleges across <br />the nation on transportation plans, campus master plans, parking studies, <br />and other transportation and traffic studies. Our emphasis always is on <br />creating a pleasing and safe pedestrian environment, and accommodating <br />growth while minimizing parking needs and traffic. Specific studies can <br />include pedestrian circulation and safety, parking, accessibility, internal <br />circulation, traffic congestion and impacts, transit, bicycle movement, <br />and travel demand management. Our extensive master planning <br />experience has provided us with a unique understanding and approach to <br />campus transportation systems. <br />M /A/B is very skilled in the areas of traffic impact analyses, traffic <br />assessments, transportation management plans, roadway design, signal <br />design, and access management for master planning projects. We <br />understand the importance of anticipating demands on the transportation <br />network and to mitigate any negative operational impacts of proposed <br />developments. Using industry standard analysis techniques, M /A/B can <br />determine the micro and macro level effects of travel patterns and can <br />therefore identify appropriate mitigations. Each project is unique and <br />combines several individualized transportation challenges. These <br />typically involve accessibility, internal circulation, traffic congestion, <br />traffic impacts, signal warrants, signal design, pedestrian safety, parking, <br />transit, bicycle movement, financing, local and regional transportation <br />issues. <br />Maple Commerce Park TIA <br />Currituck County, North Carolina <br />Client Reference: Ben Woody — (252) 232 -6029 <br />M/A/B staff participated in the master planning and <br />community charrette process for the Maple Park Site and <br />then conducted a two -phase Traffic Impact Analysis <br />(TIA) to analyze the impacts of ultimate plan along US <br />Southern Change Campus Master Plan Page 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.