Orange County NC Website
. f.e <br />C <br />b, <br />TASK 5: DRAFT MASTER PLAN <br />C L A R 1 ® N <br />Ta: k 5 focuses on preparation of a draft Master Plan for the site, incorporating <br />the findings and ideas from Tasks 1 -4, along with recommended appropriate <br />modifications of the current approved plans for the property. The Plan will <br />adc.ress parking issues (number and placement of parking spaces) and <br />pec estrian/bicycle circulation issues. The Master Plan will address future <br />deN elopment of the site, areas to be preserved, attention to slopes and <br />sto:mwater management issues, transportation improvements that would be <br />needed, and required infrastructure improvements. neighborhoods) and also <br />are is of environmental sensitivity. The Master Plan will be accompanied by a <br />narrative report that summarizes existing conditions, explains the Orange <br />County facility needs would be addressed here at the Southern Orange Campus. <br />Thf: Master Plan will draw a link between use of the site, sustainable design <br />principles, infrastructure needs, and community needs. <br />An accompanying product will be a set of Design Guidelines for use and <br />reference in subsequent preparation of detailed site plans and building drawings <br />as portions of the site become ready for development. The Design Guidelines for <br />the site will address height, density, massing, public access, and energy <br />conservation issues both for site and building design. <br />Thf; Plan will include options for road improvements, along with intersection, <br />transit, bicycle, and pedestrian improvements in the area that may be necessary <br />to support the new facilities. Mobility considerations will include access to <br />future Carolina North facilities, pedestrian access connecting to all surrounding <br />are is, and accommodation of transit service. <br />TASK 5: DRAFT MASTER PLAN (200-300 <br />CLARION TEAM: <br />consultant hours) <br />ORANGE COUNTY'STAM <br />Analyze existing conditions and present alternative infrastructure <br />configurations for : onsideration. <br />Provide information and review possible alternatives <br />with consultant team. <br />Prepare a report summarizing findings and potential approaches. <br />Review and comment on report. <br />SCHEDULE <br />[Completed: 6 months after Project Initiation <br />TASK 6: FINAL MASTER PLAN <br />Ta.,k 6 pulls together all the information and work products from Tasks 1 -5 for <br />the purpose of constructing a Final Master Plan and a recommended set of <br />De sign Guidelines for the Southern Orange Campus site. Upon approval of a <br />Master Plan by the Orange County Board of Commissioners, the consultant will <br />prepare a submittal to the Town of Chapel Hill to modify the existing Special <br />Usi; Permit for the site. The consultant team and staff will work to take the <br />Mc dification application through the Chapel Hill review and approval process, <br />So!athern Orange Campus Master Plan Page 16 <br />