Browse
Search
2012-112 AMS - Clarion Associates LLC - Southern Master Plan Clarion Associates LLC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-112 AMS - Clarion Associates LLC - Southern Master Plan Clarion Associates LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2015 9:21:06 AM
Creation date
5/29/2012 10:55:01 AM
Metadata
Fields
Template:
BOCC
Date
5/15/2012
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
5k
Document Relationships
2012-112 S AMS - Clarion Associates LLS for SHSC Master Plan $110,000
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
Agenda - 05-15-2012 - 5k
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 05-15-2012 - Regular Mtg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. fo° <br />0a° <br />° <br />C L A R 1 <br />TASK 3: COMMUNITY OUTREACH (100-300 <br />CLARION TEAM: <br />consultant hours) <br />ORANGE COUNTY STAFF: <br />Conduct development stakeholder interviews. <br />Arrange logistics for stakeholder interviews. <br />Conduct Public Information Meeting <br />Arrange logistics for Public Information Meeting. <br />SCHEDULE <br />Completed: 3 months after Project Initiation <br />TASK 4: CONCEPT PLANS <br />Based upon the previous plans and visions for development of this site, ideas <br />and concerns growing out of the public outreach efforts, and in consideration of <br />Orange County's needs for additional facilities in this part of the County, <br />conceptual development scenarios will be prepared for the site. Three <br />alternative concepts will be prepared, showing different levels of intensity, <br />different configurations of buildings, and different parking strategies. Estimates <br />of likely vehicular traffic impacts of possible development will be prepared, <br />along with analysis of the possibilities for increased use of public transit, biking, <br />and walking as modes of transportation. Draft design guidelines will be prepared <br />for consideration, with ideas for pedestrian- oriented design of buildings and with <br />principles to be included in siting buildings. Emphasis will be placed on <br />resiliency and sustainable design principles. A second Public Information <br />Meeting will be held to facilitate public review and comment on the alternatives. <br />TASK 4: CONCEPT PLANS (150-300 <br />consultant hours) <br />CLARION TEAM: <br />ORANGE COUNTY STAFF: <br />Preparation of 3 alternative concepts for development of the site. <br />Describe advantages and disadvantages of each. Prepare discussion <br />Review and comment on proposed alternatives, and <br />of likely transportation impacts of full development of the site. <br />work with consultant in preparing conceptual plans. <br />Conduct a second Public Event to review alternative concepts and <br />Arrange for logistics and notifications for public <br />elicit comments. <br />meeting. Assist in distributing materials. <br />SCHEDULE <br />Completed: 5 months after Project Initiation <br />Southern Orange Carnpus Muster Flan rave 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.