Orange County NC Website
. fo° <br />0a° <br />° <br />C L A R 1 <br />TASK 3: COMMUNITY OUTREACH (100-300 <br />CLARION TEAM: <br />consultant hours) <br />ORANGE COUNTY STAFF: <br />Conduct development stakeholder interviews. <br />Arrange logistics for stakeholder interviews. <br />Conduct Public Information Meeting <br />Arrange logistics for Public Information Meeting. <br />SCHEDULE <br />Completed: 3 months after Project Initiation <br />TASK 4: CONCEPT PLANS <br />Based upon the previous plans and visions for development of this site, ideas <br />and concerns growing out of the public outreach efforts, and in consideration of <br />Orange County's needs for additional facilities in this part of the County, <br />conceptual development scenarios will be prepared for the site. Three <br />alternative concepts will be prepared, showing different levels of intensity, <br />different configurations of buildings, and different parking strategies. Estimates <br />of likely vehicular traffic impacts of possible development will be prepared, <br />along with analysis of the possibilities for increased use of public transit, biking, <br />and walking as modes of transportation. Draft design guidelines will be prepared <br />for consideration, with ideas for pedestrian- oriented design of buildings and with <br />principles to be included in siting buildings. Emphasis will be placed on <br />resiliency and sustainable design principles. A second Public Information <br />Meeting will be held to facilitate public review and comment on the alternatives. <br />TASK 4: CONCEPT PLANS (150-300 <br />consultant hours) <br />CLARION TEAM: <br />ORANGE COUNTY STAFF: <br />Preparation of 3 alternative concepts for development of the site. <br />Describe advantages and disadvantages of each. Prepare discussion <br />Review and comment on proposed alternatives, and <br />of likely transportation impacts of full development of the site. <br />work with consultant in preparing conceptual plans. <br />Conduct a second Public Event to review alternative concepts and <br />Arrange for logistics and notifications for public <br />elicit comments. <br />meeting. Assist in distributing materials. <br />SCHEDULE <br />Completed: 5 months after Project Initiation <br />Southern Orange Carnpus Muster Flan rave 15 <br />