Orange County NC Website
4 A <br />Scope of We rk, Schedule, and Budget <br />Southern Orange Campus Master Plan — Clarion Team <br />April 25, 2012 <br />The Scope of Work for this initiative will involve five tasks in Phase 1 to prepare a Master Plan, and a Phase 2 <br />to take an application through the Chapel Hill review and approval process. <br />Phase 1 <br />Task 1: Project Initiation and Review of Information. Review the Vision, Objectives, and <br />Fundamental Principles for this initiative with County staff in order to construct a detailed project <br />schedule and citizen engagement strategy. Assemble and review Orange County's most current <br />facility, service plans, and related policy plans. Review previously prepared and approved plans for <br />this site to determine what information needs to be updated. Assemble, review, and summarize <br />information from related current initiatives, including the Carolina North Development Agreement, <br />plamied transportation improvements, and the Chapel Hill 2020 Comprehensive Plan. Meet with <br />Chapel Hill Planning Department Staff to confirm process (including submittal requirements and <br />timelines) for amendment of the approved plans for this site. Review Orange County discussions <br />regal ding facility needs and space planning (from January discussions). Review transportation <br />conditions and plans for the vicinity of the site, including transit services. Establish staff Project <br />Team and a Planning Committee (to include representatives from Orange County Board of <br />Commissioners). Confirm targets for building and facility space for this site. <br />PROJECT TASK 1. <br />• OF •• • <br />CLARION TEAM: <br />ORANGE COUNTY STAFF: <br />Meeting with Orange County project management team. <br />Initial meeting with consultant project management team. <br />Finalize work plan, identify stakeholders, citizen <br />Finalize work plan, identify stakeholders, and collaborate on <br />engagement strategy. <br />citizen engagement strategy. <br />Transmit Orange County plans, transportation studies, <br />Review background information. <br />environmental studies, infrastructure studies, and other County <br />information relevant to this site and its surroundings, in both <br />digital and hard copy format wherever possible. <br />Prepare summary of data, regulations, plans, studies, and <br />Gather information, review and comment on summary. <br />conditions. <br />Prepare series of GIS snaps. <br />Assist in gathering GIS layers for mapping. <br />SCHEDULE <br />Completed: 6 weeks zfter Project Initiation <br />• Task 2: Concept Plans. Prepare three conceptual plans for additional buildings on this site, with <br />altercate approaches to building siting, undisturbed areas, parking, walkways, and connections to off - <br />site bike and sidewalk network. Prepare estimates of square footage yields and transportation <br />implications of the additional buildings and services (streets, transit, parking, bike and pedestrian <br />mov ,,ments). Include options for park- and -ride facility, coordinating with on -site parking needs. <br />Arrange for survey of the site (to be contracted separately by Orange County). Describe phasing <br />options, to include consideration of a 25 -year buildout, options for building construction in the next <br />five years, consideration of the process for amending the site's Special Use Permit with the Town of <br />Chapel Hill, and possibilities for immediate work on the site to develop parking and establish building <br />footprints. Review concepts with staff and Planning Committee. Arrange for presentation to Orange <br />Cou,ity Board of Commissioners to select preferred concept. <br />e 1 <br />Southern _ e i.Y, <, Master l'I,r pac <br />