Browse
Search
2012-113 AMS - Schindler Elevator Corporation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-113 AMS - Schindler Elevator Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2012 10:29:18 AM
Creation date
5/22/2012 3:47:56 PM
Metadata
Fields
Template:
BOCC
Date
1/18/2012
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Mgr Signed
Document Relationships
2012-113 S AMS - Schindler Elevator Corporation $ 9,150
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHINDLER ELEVATOR CORPORATION <br />2101 Westinghouse Blvd -Suite 102 <br />Raleigh, NC 27604 -2477 <br />Phone: 919- 954 -9454 <br />Fax: 919- 954 -9433 <br />UPGRADE ORDER AGREEMENT <br />Date: April 5, 2012 <br />To: Orange County Asset Mgmt & Purchasing <br />131 W. Margaret Lane <br />Hillsborough, NC 27278 <br />Attn: Jeffrey Thompson <br />Estimate Number: GPEY- 8T3UTT (2012.2) <br />Customer: Orange County -R E Whitted Bldg <br />W. Tryon Street <br />Hillsborough, NC 27278 <br />Schindler hereby proposes to furnish and install the following with respect to the one (1) hydraulic elevator, <br />NC DOL #9577 as follows: <br />Emergency Recall Operation <br />Schindler Elevator Corporation is proposing to provide all labor and supervision required to perform the following <br />scope of work during the regular working hours of the elevator trade: <br />- Provide all necessary engineering services to ensure a code compliant installation. <br />- Reuse the existing Emergency Recall control panel in the elevator machine room and mount to the existing <br />elevator controller. <br />- Provide a new add -on keyswitch panel at the main recall level and in the car for activation and operation of the <br />Emergency Recall System. <br />- Interface the emergency recall controller and new keyswitches with the elevator control system. Automatic <br />Phase I Emergency Recall Operation will be such that when a general alarm is signaled to the controller (i.e. <br />from any smoke sensing device at the elevator entrances, machine room, or hoistway) the elevator will <br />automatically recall to the designated level. If a signal is received from the main floor smoke sensing device, the <br />elevator will automatically recall to an alternate floor (if the main recall floor does not have sprinklers). Once the <br />car has been recalled to the designated level, the elevator will be equipped with an in -car keyswitch, known as <br />Phase II operation, which would allow emergency personnel to gain control of the elevator. <br />- Test operation of the system in the presence of an inspector and return the unit back into service. <br />Work by Others: <br />- Smoke sensing devices at all floors, hoistway, and the elevator machine room. Smoke sensing devices <br />installed and wired by others will be equipped with a dry contact and will be wired to the elevator machine room <br />for connection to the elevator control circuits. <br />- Cutting or patching of walls to accommodate new keyed switches for the emergency recall system. <br />Page 1 of 3 <br />GPEY- 8T3UTT <br />2012.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.