Orange County NC Website
County Zoning.ordinance. HandicaRped parkins spaces shall be barrier <br />(1) so that handicapped individUgls are not compelled to <br />wheel or walk behind parked cars <br />(2) <br />(3) in conjunction with sidewalk cut -aways and/or ramps, in <br />compliance with the North Carolina State Building Code. <br />d. The parking area shall be screened and landscaped in accordance <br />with Article 12 of the orange County Zoning Ordinance. <br />e. <br />on either side cleared of brush or vegetation and 1Q feet over -head <br />clearance. <br />The location of these items to be approved by the Zoning Officer and <br />shown on the revised site plan. <br />8. The following recommendations apply to the lot arrangement: <br />a. Each lot platted on the Final Plat shall include the area <br />associated with the building site and the septic tank, including the <br />three to be located off the property subject to the rezoning /special use <br />permit. Appropriate easements shall be platted and recorded with the <br />Orange County Register of Deeds along with legal descriptions and <br />easement agreements submitted to and approved by the Orange County <br />Attorney. <br />b. All lots shall have Health Department approval prior to the <br />approval of.-the Final Plat. <br />c. For each structure exceeding 251 in height an additional one (1) <br />foot side and front setback for every two (2) feet of additional height <br />shall be designated on the Final Plat. <br />The location of these items is to be approved by the Zoning Officer <br />and shown on the revised site plan. <br />9. <br />10. All final plans for drainage, soil erosion and sedimentation control <br />shall be reviewed and approved by Orange County and the site plan <br />modified accordingly to satisfy the Soil and Erosion specifications, <br />prior to the issuance of -the Special Use Permit. •_In.addition,- ;;ange <br />County shall inspect the installation of control devices and the on -going <br />work for the total project. The project shall at all times meet the <br />