Browse
Search
Agenda - 05-29-2012 - C1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 05-29-2012 - Budget Work Session
>
Agenda - 05-29-2012 - C1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2015 10:30:18 AM
Creation date
5/21/2012 11:13:42 AM
Metadata
Fields
Template:
BOCC
Date
5/29/2012
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C1
Document Relationships
Minutes 05-29-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
47 <br />r <br />3. All necessary easements to permit utility (electricity, telephone) <br />installation, servicing and hookups to the development and to each un?t <br />within the development shall be provided at no cost to the utility <br />provider. <br />4. The grantee shall promulgate Articles of Incorporation governing <br />tenancy in the development and shall record a copy of the Articles of <br />Incorporation and Regulations promulgated under this condition in the <br />Orange County Registry of Deeds. <br />5. Roads, parking areas, walkways, street signs, utilities, recreation <br />facilities and sites, landscaping of the community center and its <br />associated parking facility shall be maintained as constructed. All such - <br />improvements and facilities shall further be maintained and operated in a <br />safe manner. <br />6. The following recommendations apply to the road and parking <br />facilities: <br />a. Road name signs to Orange County standards shall be erected at <br />all intersections. <br />b. The private Class A road' serving the community center shall <br />terminate in a cul -de -sac. The parking facility for the community center <br />shall access off the.private road, but not the cul -de -sac itself. <br />C.. The private Class A road serving the community center shall be <br />constructed to Orange County private road standards' but shall be hard - <br />surfaced in compliance with NCDOT Minimum Construction Standards for <br />pavement design for subdivision roads. The privatg road shall be subject <br />d. sight triangles in compliance with NCDOT requirements and Article <br />9 of 'the, orange County Zoning Ordinance shall be provided at all road <br />intersections and shall be designated as part of the right -of -way. <br />e. Two parking spaces meeting the dimensional requirements provided <br />in Article 10 of the orange County Zoning Ordinance shall be provided for <br />each dwelling unit. <br />The location of these items shall be approved by the Zoning Officer <br />and shown on the revised site plan. <br />7. The following 'recommendations' apply to the recreation area and <br />facilities. <br />a. Tot lot /playground area to include play apparatus for children, <br />ages pre- school to 14 (i.e. swings, slides, climber, whirl) and benches <br />for adult supervision. some shaded areas are to be provided within the <br />tot lot area. The tot lot area shall be defined /enclosed with a barrier. <br />b. Picnic area to include a small shelter with 3 -4 tables. One (1) <br />trash.receptacle and one (1) grill per 2 tables. <br />C. Provide one (1) parking space for each dwelling unit. Provide <br />one (1) handicapped'parking space for every 10 spaces. Parking spaces <br />shall meet the dimensional requirements of Article 10 of the Orange <br />
The URL can be used to link to this page
Your browser does not support the video tag.