Browse
Search
Agenda - 05-29-2012 - C1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 05-29-2012 - Budget Work Session
>
Agenda - 05-29-2012 - C1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2015 10:30:18 AM
Creation date
5/21/2012 11:13:42 AM
Metadata
Fields
Template:
BOCC
Date
5/29/2012
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C1
Document Relationships
Minutes 05-29-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTH CAROLINA �,44 21 <br />'GE COUNTY ��C' 725 ±�: a 6 <br />for every two (2) feet of additional height <br />shall be designated on the Final Plat. <br />The location of these items is to be approved by <br />the Zoning Officer and shown on the approved final <br />site plan. <br />9. The location of the community wells shall be <br />approved by the N.C. Department of Human Resources, <br />Division of Health Services, and shown on the <br />approved final site plan prior to the issuance of <br />the Special Use Permit. <br />10. All final plans for drainage, soil erosion and <br />sedimentation control shall be reviewed and <br />approved by Orange County and depicted on the <br />approved final site plan prior to the issuance of <br />the Special Use Permit. That plan shall include <br />designation of drainage easements of a width <br />specified by the Erosion Control Officer along the <br />creek and intermittent stream. In addition, Orange <br />County shall inspect the installation of control <br />devices and the ongoing work for the total project. <br />The project shall at all times meet the <br />requirements of the Orange County Soil Erosion and <br />Sedimentation Control Ordinance. <br />11. Construct and maintain stormwater devices to <br />control the peak rate of runoff from the community <br />center and artist bungalows. The detention devices <br />shall be designed and constructed so that the peak <br />rate of runoff after development will not exceed <br />the pre - development rate for a 20 -year 24 -hour <br />storm and for storms of greater intensity. <br />12. Grading on the site shall be kept to a minimum. <br />Existing vegetation shall be maintained between <br />units. Clearing shall only be conducted for <br />purposes of installing roads, utilities and other <br />improvements until the improvements have been <br />installed and the developer conveys title to the <br />property to the individual property owners <br />purchasing three or fewer lots. <br />Existing vegetation shall not be removed from the <br />area within 50 feet of the Duke Forest property <br />line. <br />13. Final landscaping plans shall be submitted and <br />approved by the Zoning Officer prior to the <br />effective date of the Special Use Permit. <br />14. That all signs be erected in compliance with <br />Article 9, Signs, following issuance of a building <br />
The URL can be used to link to this page
Your browser does not support the video tag.