Browse
Search
Agenda - 02-27-2012 - C4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 02-27-2012 - Quarterly Public Hearing
>
Agenda - 02-27-2012 - C4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2015 4:15:11 PM
Creation date
5/17/2012 3:02:51 PM
Metadata
Fields
Template:
BOCC
Date
2/27/2012
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C4
Document Relationships
Minutes 02-27-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses <br /> 36 Section 5.10:Standards for Telecommunication Facilities <br /> (G) ID) General Building <br /> and Inspection Standards for all Telecommunication Support Structures. <br /> Prier t„the Division, N4 <br /> wireless teleGO atk)ns support tr Gt o must meet th` MR�� <br /> standwdsr. <br /> I Requirements 25 <br /> (a) A site plan pFepaFed in aGGGFdanGe with SeGtieR 2.6 shall be pFesented <br /> development Plan apffeval as required. <br /> (b)- A Fendering OF photograph of the tower limited , <br /> GOR6;stenGy with the definitien of stealth faGility. <br /> nertc ies the <br /> analysis,type of antennas it Gan aGGE)Mmedate. <br /> (d) A statement stating ho he pF------4 16--eF will minimize visual <br /> (e) The exiGt*Rg Gel! Mes (latitude, lengitude, power levels) to WhiGh this <br /> (g) The seaFGh FiRg utilized in finding the propesed site. <br /> (h) The make, model and maRufaGtUFeF ef the t9weF and aRtenRa(s), <br /> antenna heights and pewer levels of prepesed site. <br /> 0) The frequeRGY, M9-E-'I.I-C_4+and Glass of seNiGe of radie OF other <br /> (k) The diFeGtiOR(S) of maximum lebes and aSSE)Giated- Fad-kafin—n of the <br /> crc <br /> -,rT <br /> 0) GeFtifiGation that the N"F=R levels at the pFoposed site are within the <br /> thFeshold levels adopted by the FCC. <br /> ethe t le mr at s .dev/nes <br /> 24 All telecommunication support structures require the issuance of a building permit prior to the commencement of <br /> earth disturbing activity. The existing Ordinance created confusion and had led some to argue that the standards <br /> formerly contained in Section 5.10.8 only applied to towers approved administratively. Staff has re-worded the <br /> section to remove the ambiguity and correct the interpretive issue. Staff has also proposing to move these <br /> requirements to the end of 5.10.8 in an effort to group submittal/review standards for telecommunication support <br /> structures to the beginning of this section. <br /> 25 Regulations denoted in green have been re-located to Section 5.10.8(A)(1)into the proposed revised format. <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.