Browse
Search
Agenda - 02-27-2012 - C2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 02-27-2012 - Quarterly Public Hearing
>
Agenda - 02-27-2012 - C2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2015 3:27:39 PM
Creation date
5/17/2012 2:58:47 PM
Metadata
Fields
Template:
BOCC
Date
2/27/2012
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C2
Document Relationships
Minutes 02-27-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />To create consistency between the City of Durham's UGB and the Orange County <br />Land Use Plan wherein both areas would suggest an urban growth pattern. <br />Thereafter a zoning change would be made to a consistent implementing zoning <br />district that would regulate with standards, permitted uses and processes the form of <br />development. <br />2. Analysis <br />This area is within Orange County WASMBPA primary utility service area. <br />This area is within City of Durham's UGB. <br />This area can be served by an existing utility service agreement with the City of <br />Durham that can be extended to this area because of topographic sewershed. The <br />Eno Small Area Plan (SAP) anticipated urban /suburban densities in this area. Many <br />existing Mobile Home Parks are in the area at higher densities than typical non - public <br />sewered areas creating a fragile yet important housing segment. Some parks have <br />marginal private septic systems that could be prone to failure at such densities and <br />limited soils percolation. This area is adjacent to the Eno ED zone which primarily <br />` supports non- residential and could provide an adjacent residential component for the <br />urban transition work force. (Update. Orange County and City of Durham have <br />adopted a utility service agreement in January 2012) <br />Q <br />Comprehensive Plan Linkage (i.e. Principles, Goals and Objectives) <br />i ED -1.2 <br />Form partnerships both within and outside the County to create a stronger business <br />j climate and market the changes to existing and potential employers. <br />j ED — 2.1 <br />Encourage compact and higher density development in areas served by water and <br />sewer. <br />ED — 2.2 <br />ED — 2.5 <br />ED — 2.6 <br />ED —2.7 <br />ED — 2.10 <br />ED 3.5 <br />Ensure that County workers and those preparing for the workforce have access to <br />transportation, childcare, elder care, and affordable housing. <br />H -1.5 <br />Ensure that a variety of housing types can be developed throughout the County in a <br />sustainable manner that locates housing near employment centers and commercial <br />centers and that efficiently uses existing and planned public services. <br />H -3.3 <br />Expand assistance in the retrofitting, repair, and maintenance of existing homes <br />owned by financially challenged households, particularly those that are senior <br />citizens. <br />H -- 4.1 <br />Continue to permit HUD code - compliant manufactured housing.as a form of <br />affordable housing in the County. <br />LU —1.1 <br />Coordinate the location of higher intensity / high density residential and non - <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.