Browse
Search
Minutes - 20040219
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2000's
>
2004
>
Minutes - 20040219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2008 3:33:27 PM
Creation date
8/13/2008 2:19:42 PM
Metadata
Fields
Template:
BOCC
Date
2/19/2004
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TTA Service Performance Standards <br />Five Indicators are Measured: <br />- unlinked passenger trips per vehicle revenue hour <br />- cost recovery ratio <br />- operating cost per unlinked passenger trip <br />- subsidy per passenger trip <br />- unlinked passenger trips per vehicle revenue mile <br />System averages are calculated for each indicator: <br />- also calculated for time of service (e.g., weekday, Saturday} and type of service (e.g., <br />regional, shuttle} <br />Each route is classified by performance: <br />- high-performing -value is greater than 150°~ of system or category average <br />- average -value is equal to or greater than 50°~ of system or category average but less than <br />or equal to 150% <br />- low performing -value less than 50°~ of system or category average <br />TTA Service Change Standards <br />- Route segment-level analysis will be used to evaluate minor route pattern or timing changes <br />- Based on the comparison of routes to their peers and the TTA system, TTA staff will <br />recommend changes to improve the following: <br />o Service effectiveness <br />o Cost effectiveness <br />o Cost efficiency <br />- Public meeting will be held if service changes are proposed which affect greater than 25°~ of <br />the route-miles on the affected route <br />TTA Service Elimination Standards <br />- A route that has been operating for more than six months and is "low-performing" against <br />three of five indicators can be considered for elimination <br />- Prior to recommending route elimination to the TTA Board, the following will occur: <br />o At minimum, one public meeting will be held in the jurisdiction of the proposed <br />elimination <br />o Alternatives for improving route performance will be evaluated, including marketing <br />and promotions, route changes, or other strategies <br />- If TTA proposes to eliminate more than 25°~ of the service hours on a route, or eliminates a <br />number of trips an a route that affect more than 25% of the route's ridership, TTA will hold a <br />public hearing for public comment on the proposed change <br />TTA Service Introduction Standards <br />- New service will be introduced based upon the following: <br />o Density analysis <br />o Demand analysis <br />o New service requests <br />o Provision for key destinations <br />- New services will be evaluated by "new route" performance standards <br />o Established at 75% of regular performance standards <br />
The URL can be used to link to this page
Your browser does not support the video tag.