Browse
Search
2001 S Co Manager - Contract with OWASA to Extend Main Water Lines to Historic Rogers Road Neighborhood
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2001
>
2001 S Co Manager - Contract with OWASA to Extend Main Water Lines to Historic Rogers Road Neighborhood
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 4:55:10 PM
Creation date
5/15/2012 10:04:56 AM
Metadata
Fields
Template:
BOCC
Date
2/7/2001
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
8l
Document Relationships
Agenda - 02-07-2001-8l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 02-07-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 5 <br />2. Design phase. <br />a. A design consultant shall be selected by and under contract with <br />OWASA to develop plans for the Project. The design shall be based on specifications and <br />requirements provided by OWASA. Both parties shall approve the scope of work for the design <br />consultant. <br />b. The costs of the design work shall initially be paid for by OWASA. The <br />County shall periodically reimburse OWASA for all costs associated with the design of the <br />Proj ect. <br />c. In order to ensure proper and effective project management, the design <br />consultant and any sub - consultants shall report to OWASA staff who shall work closely with <br />County staff to ensure the County's requirements for the Project are met. In the event of any <br />apparent conflicts between the County's and OWASA's requirements, the parties shall work <br />together to find reasonable compromise and accommodations for the Project. <br />d. In close coordination with OWASA and consistent with the need for <br />effective project management as outlined in Section 2c above, the County Staff will have full <br />access to the design consultant and all relevant sub - consultants for any aspect of the Project. <br />OWASA will authorize the design consultant and subcontractors to meet with County <br />representatives or provide any information needed by the County on any aspect of the Project. <br />3. Construction phase. <br />a. The bidding procedure for the construction contract shall be <br />administered by OWASA. County staff will participate in review of bid documents and <br />submitted bids. <br />b. The contract will be awarded and entered into by OWASA, taking into <br />consideration the recommendations and requests of the County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.