Browse
Search
S N.C. Department of Transportation Request for Right-of-way at McDougle Elementary School
OrangeCountyNC
>
Board of County Commissioners
>
Various Documents
>
2000 - 2009
>
2001
>
S N.C. Department of Transportation Request for Right-of-way at McDougle Elementary School
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 4:56:28 PM
Creation date
5/15/2012 10:00:17 AM
Metadata
Fields
Template:
BOCC
Date
2/7/2001
Meeting Type
Regular Meeting
Document Type
Others
Agenda Item
8k
Document Relationships
Agenda - 02-07-2001-8k
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2001\Agenda - 02-07-2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. _ It <br />MICHAEL F. EASLEY <br />GOVERNOR <br />M S�Rp� <br />STATE OF NORTH CAROLINA <br />DEPARTMENT OF TRANSPORTATION <br />P.O. BOX 14996 <br />Greensboro. NC 2731 5-996 <br />March 19, 2001 <br />STATE PROJECT: 9.8070220 <br />I. D. #: U -3100A <br />COUNTY: Orange <br />DESCRIPTION: Improvement of Hillsborough Road <br />Orange County <br />Mr. Paul Thames, County Engineer <br />P.O. Box 8181 <br />Hillsborough, NC 27278 <br />Dear Mr. Thames: <br />LYNDO TIPPETT <br />SECRETARY <br />Thank you for your cooperation in the acquisition of County Property for the above project. Please accept the details <br />of this letter as conditional acceptance of the amendments requested by the County. My intended meaning of <br />Conditional is that the Department will repair the temporary damage to the construction areas as it relates to the <br />project in a manner to restore the property to the way it exists now. On March 7, 2001, I met with Mr. Patrick <br />Wilson, Resident Engineer, at the McDougal School Property. Mr. Wilson stated that we could work around the <br />chain link fencing at the rear entrance, therefore we do not anticipate damaging the fence. There were no bushes or <br />landscape items within the easement area, therefore the contractor will re -seed the disturbed areas after completion of <br />the work. There is a small entrance sign within the easement. Mr. Wilson said they would stockpile the sign and <br />have it erected again upon completion of the work. All curbing, pavement, drainage, and sidewalk will be properly <br />tied to the new road. Mr. Wilson further stated that he anticipates much of the work taking place during summer <br />months while school is out, but will contact the school concerning the traffic on the project. Please share this <br />information with the proper Authorities. Once again, thank you for your assistance. If further discussion is needed, <br />please contact me by email at rluttle "u dot. state 1C Uz, or by phone at (336)334 -3515. <br />Sincerely, <br />r, <br />R.D. Tuttle <br />Senior Right of Way Agent <br />RDT <br />Cc: Pat Wilson, Resident Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.