Browse
Search
Agenda - 05-15-2012 - 5k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 05-15-2012 - Regular Mtg.
>
Agenda - 05-15-2012 - 5k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2012 2:43:37 PM
Creation date
5/11/2012 2:43:23 PM
Metadata
Fields
Template:
BOCC
Date
5/15/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5k
Document Relationships
2012-112 AMS - Clarion Associates LLC - Southern Master Plan Clarion Associates LLC
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2012
Minutes 05-15-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
70 <br />Qualifications for 4range County <br />Relevant Experience <br />• Maple Commerce Park TIA, Currituck County, <br />NC. Project mauager for master planni.ng <br />and community charxette process for the <br />Maple Park Site and a two-phase TIA to <br />analyze the impacts of ultimate plan along <br />US 258 in Currituck, NC. <br />~ Morris Grnve Elementary Traffic Engineering 4nd <br />Koundabaut Deszgn, Ca~rboro, NC. Ptoject manager for TIA and fiznctional design of <br />xoundabout <br />• Durham Pul~lic Schoolr Tra~c Engineering Seryice,c Project manager to provide Durham Public <br />Schools (DPS) traffic engineering services to sevexal schooLs undergoing new construction <br />and renovations. <br />~ Ciy of Durham Tra~c Calming Studie.r, Durham, NC. Project transportation e,ngineer responsible <br />for detenni.ning eaisting vehiculai speeds and volumes, intetsection levels of service, meeting <br />with local residents, and recommendi~g traffic calming measures to alleviate problems within <br />three major City neighborhoods. <br />• Miactllaneorts Traffu Irrc~actAnaly.rer, ThrnughoutNC. Project manager for vatious traffic impact <br />studies for private and public clients including, univexsities, .developers, architects, and ott-cail <br />agteements with municipalities. Over 300 studies completed to date. <br />• Dare Couniy Board afEducation, NC. Project managex to ptovide traffic assistance for sevexal <br />schools slated for new construction or proposed zenovauons. <br />~ On-Call TIA Serrrices, Cary, NC. Project manager xesponsible for overseeing and reviewing <br />"I'IAs. To date, 65 traffic studies have been conduded as part of this contract including T7As <br />for numerous schools. <br />• TriangleMetro CenterTra~clmpactAnaly.ri.r, BTP, NC. Project trausportation engineer <br />responsible for detP+~+r;n;~g the traffic impact of a large multi-use development and regional <br />transpoYtation center. ~ <br />• PerimeterPark IlI - SlaterPmperties, Mo~rzrville, NG Project manager for TIA for the proposed <br />1.5 million square feet, multiple building office development between NC 54 and Slater Road <br />south of NC 540. The study included peak hour traffic opexations analpses of more than 40 <br />existing and future intersections and site accesses. <br />• Cmy Park~vay and High Hoar.re Kaad Intersection Im~irovement.r, Cary, NC. As principal-in-charge <br />oversaw the development of seven unique intersection alternatives, such as traditional <br />wideni.ng, qua.drant toadways, bowtie, and roundabouts. <br />• Do~vntown Baleigh Iivable Sireet,r Plan, NC. Project tcaffic engineer tesponsible for the <br />Synchro/SimTraffic modeling of the entixe downtown Raleigh stteet spstem consisting of <br />over 100 intersections. <br />• Fayetteville StrretBenai.rsance, I~aleigh, NC. As Project engineer, assisted in the design of the <br />reopen.ing of Fayetteville Street Mall to vehicular tsaffic and the conversion of Martin Street <br />and Hargett Street to two-way operation. Products included signal designs for 18 <br />intersections, functional design of two-way street conversion, signiugplans, and striping <br />plans. <br />Martin/Alexiou/Bryson, P.C. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.