Browse
Search
Agenda - 05-15-2012 - 5k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 05-15-2012 - Regular Mtg.
>
Agenda - 05-15-2012 - 5k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2012 2:43:37 PM
Creation date
5/11/2012 2:43:23 PM
Metadata
Fields
Template:
BOCC
Date
5/15/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5k
Document Relationships
2012-112 AMS - Clarion Associates LLC - Southern Master Plan Clarion Associates LLC
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2012
Minutes 05-15-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 4~ <br />Quali#ications for Orange Couniy <br />WakEMed~edeveiopment~rafficimpact-~tnalysis - - - <br />Duke Realty/ Raleigh, North Carolina <br />Client Referencs: Jeremy Fortier -(31~ 808-6431 <br />M/A/B completed a TIA and signal <br />wartant analysis for the redevelopment <br />of a site along Sunr~ybrook Road near <br />Neav Bem Avenue. The redevelopment <br />will consist of 153,200 square feet of <br />medical office space, built in two <br />phases. The analysis incorporated <br />im.provements at an adjacent <br />intexsection of Calumet Drive that had <br />been a safetp concern for die City of <br />Raleigh and NCDOT. Additional off- <br />site i.mprovements included re-striping the Sunnpbrook Road approach at New Bern Avenue and <br />signal and electrical plans fox the intersection to accommodate these impxovements. A txaffic <br />signal is desired at the intersection of Suunybrook Road and the Main Enttance to accommodate <br />the site traffic, pedestrian traffic, and re-routed traffic from the improvements at the upstteam <br />Calumet Drive access restriction. Therefore, a signal warrant analysis v~as submitted to the Citp of <br />Raleigh and negotiations ate cutrently underwaq to incorporate the signal into the plans for the <br />WakeMed site. <br />Durham Public Schools Traffic Eng'ineering Services <br />Durham PublicSchools/ Durham, North Carolina <br />Ciient Reference: Tim Carr -(919) 560-2216 <br />Over the last eight pears, Durham Public <br />Schools (DPS7 has contracted with M/A/B to <br />provide traffic engineering services fot several <br />schooLs undergoing aew construction and <br />renovations. T'he type of work performed fox <br />the schools has included TLAs, traffic signal <br />designs, transportation ma.nagement plans, <br />pavement marking plans, sidewalk designs, and <br />traffic signal designs for WG Pearson <br />Elementary, Creekside Elementary, Hebron <br />Elementarp, Treyburn Middle, and Jotda.n <br />High SchooL These studies also coasisted <br />Traffic Engineering Services fox Schools <br />Numerous Schools acxoss North Carolina of a review of site layout, including close <br />coordination with the NCDOT Mutticipal and School Transportation Assistance Unit (MS"I'A) to <br />ensure propex internal stacking distances fof vehicles and a safe environment for pedestrians. The <br />traffic studies included a capacity analpsis of local streets and intersections utilizing <br />Synchro/SimTraffic to determine any eBisting and future roadwaq deficiencies with the <br />construction of the schooLs. Manp of the adjacent intersections required new signals or signal <br />upgrades inclucling steel poles and mast a~ms, pedestriaii heads a,nd pedestals, and revisions to the <br />signal riming and phasing. AlI of these projects involved dose coordination between the <br />NCDOT, the. Citp of Durham, and M/A/B. Several projects required Major and Ttansportation <br />Spec,iai Use Permits due to the nutnber of peak hou= trips generated, therebp requixing expert <br />witness testimony at public heatings regarding roadway improvements and safety, traffic <br />congestion, noise, vibration and air quatity impacts. <br />martin/Afexfou/8ryson, P.C. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.