Browse
Search
Agenda - 05-15-2012 - 5k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 05-15-2012 - Regular Mtg.
>
Agenda - 05-15-2012 - 5k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2012 2:43:37 PM
Creation date
5/11/2012 2:43:23 PM
Metadata
Fields
Template:
BOCC
Date
5/15/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5k
Document Relationships
2012-112 AMS - Clarion Associates LLC - Southern Master Plan Clarion Associates LLC
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2012
Minutes 05-15-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
39 <br />~ <br />.••• •. <br />~ @ C L A R! O N <br />. <br />~.. ~...~, • <br />Wake Med <br />Duke Realty f Raleigh, North Carolina <br />Client Reference: Jeremy Fortier -(31'n 808-6431 <br />M/A/B completed a TIA and signal watrant <br />analysis for the redevelopment of a site along <br />Sunnybrook Road neaz New Bern Avenue. The <br />redevelopment will consist of 153,200 square feet <br />of inedical office space, built in two phases. The <br />analysis incorporated improvements at an adjacent <br />intersection of Calumet Drive that had been a• <br />safety concern for the City of Raleigh and <br />NCDOT. Additional off -site improvements <br />included re-striping the Sunnybrook Road <br />approach at New Bem Avenue and signal and electrical plans for the <br />intersection to accommoda.te these improvements. A iraffic signal is <br />desired at the intersection of Sunnybrook Road and the Main Entrance to <br />accommodate the site traffic, pedestrian traffic, and re-routed traffic from <br />the improvements at the upstream Calumet Drive access restriction. <br />Therefore, a signal warrant analysis was submitted to the City of Ra.leigh <br />and negotiations are currently underway to incorporate the signal into the <br />plans for the WakeMed site. <br />6. SUIIAMARY ~ <br />We believe that our team has the skill sets, local knowledge, and aational <br />experience needed for this Southem Orange Campus Master Plan. Here are our <br />thoughts on how we measure up, organized according to the selection criteria <br />listed in the Request for Proposals: <br />1. Depth of Egperience: There are a number of distinct skill sets needed <br />for this project: land planning; site design; transportation engineering; <br />infrastructure design; urban design; zoning and regulatory analysis; <br />citizen engagement; and consensus-building. We have a team that has <br />extensive experience in every area mentioned <br />2_ Demonstrated Success: This proposal lists highlights of the successes <br />of these. fums in working with local governments on similar projects. <br />We have worked extensively in North Carolina and within Orange <br />County, and have completed projects of consistently high quality. <br />3. Qualifications of Individnals: This team is full of experienced, <br />seasoned, smart, creative, dedicated professionals. We subscribe to the <br />highest expecta.tions for best-practices planning applications, and look <br />forwazd to working on this initiative <br />Southarn flrange Campus t~~laster Plan Page L5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.