Orange County NC Website
37 <br />. ~,. <br />e`'~ <br />~ <br />~~., ~...~~-' <br />C L A R 1 O N <br />258 in C~mtuck, NC. Phase I includes an Aviation School, soccer fields, <br />commerce pazk, YMCA with a senior center, and existing facilities such <br />as NC Cooperative Extension Service's Buildi.ng, Central Elementary <br />School, and the Currituck Head Start Center. Phase II includes <br />expanding the commerce pazk, constructing new facilities for the <br />C~uiztuck County Animai Center, and relocating Maple Pazk including <br />baseball fields, softball fields, skate park, and equestrian trails. Phase II <br />will aLso ciose Airport Road resulting in the rerouting of traffic and/or <br />relocation of existing facilities on Auport Road including the G~rtituck <br />Landfill Transfer Station and NC Forestry Service County Headquarters. <br />Traffic analyses and simulation modeling were performed for both <br />Phases of development and recommendations to accommodate the <br />forecasted traffc intemal to the site, including a roundabout, and along <br />US 258 were provided. ~ <br />Marris Grave Elementary Schaal Traf~ic tmpact Analysis and Roundabout ~esign <br />Chapel Hi(! - Carrboro City Schoats J Carrboro, North Carolina <br />Client Reference: Bill Mullin -(919) 967-8211, ext 28221 <br />On beha.lf of Chapel Hill - Cazrboro City Schools, M/A/B prepared a TIA <br />for the newly constructed Morris Grove Elementary School and future <br />Middle School #6 proposed along Eubanks Road in northern Carrboro. <br />Based on a request by the Town of Carrboro, four build-out scenarios <br />were analyzed to evaluate the individual impact of the elementary and <br />middie schools as well as the potential traffic benefit of building a future <br />connector road through the schooi site. The recommended intersection <br />treatrnent was a singie-lane roundabout for the intersection of the future <br />connector road and Eubanks Road to provide superlative ~affic <br />operations and to control ttavel speeds near the school site on Eubankc <br />Road. Traffic simulation was performed utilizing VISSIM ~soflware to <br />modei future traffic conditions with the schools in place and traffic <br />diversion due to the connector roadway, while also accommodating <br />significant truck traffc along Eubanks Road. M/A/B provided the <br />functional design for the rounda.bout, including critical elements such as <br />the inscribed diameter, lane widths sidewalk locations, bike lane <br />treahnents, <br />splitter <br />islands, <br />and apron <br />design. <br />Page 24 <br />Southern Orange Campus Master Plan <br />