Orange County NC Website
29 <br />• ~•.. <br />.~•• <br />~ $ <br />~~., t.~~~• <br />TASK 5: DRAFT MASTER PLAN <br />c~ s R~ o N <br />Task 5 focuses on prepatation of a draR Master Plan for the site, incorporating <br />the findings and ideas from Tasks 1-4, along with recommended appropriate <br />modifications of the current approved plans for the property. The Plan wiil <br />address parking issues (number and placement of pazking spaces) and <br />pedestrian/bicycle circuZation issues. The Master Plan will address futiue <br />development of the site, areas to be preserved, attenrion to slopes and <br />stormwater management issues, transportation improvements tfiat would be <br />needed, and required infiastructure improvements. neighborhoods) and also <br />azeas of environmental sensitivity. The Master Plan will be accompanied by a <br />narrative report that summarizes existing conditions, explains the Orange <br />__ County facility needs would be addressed here at the Southem Orange Campus. <br />The Master Plan will draw a link between use of the site, sustainable design <br />principles, infrash~ucture needs, and community needs. <br />An accompanying product will be a set of Design Guidelines for use and <br />reference in subsequent preparation of detailed site plans and buiiding drawings <br />as portions of the site become ready for developmenk The Design Guidelines for <br />the site will address height, density, massing, public access, and energy <br />conservation.issues both for site and building design. <br />The Plan wili include options for road improvements, along with intersection, <br />tra.nsit, bicycle, and pedestrian improvements in the azea tl~at may be necessary <br />to support the new facilities. Mobility considerations will inciude access to <br />future Carolina North facilities, pedestrian access connecting to a11 surrounding <br />areas, and accommodation of transit service. <br />~'~ 1 <br />Y - : GCARION TEA,M: ~; 1 !f s • r <br />=r OR:4h~GE~C•OU-~TY ST~ * <br />Analyze existing conditions and present alternative infrastructure <br />configurations for consideration. Provide information and review possible alternatives <br />with consultant team. <br />Prepare a report summarizing findings and potentia( approaches. Review and comment on report. <br />.. .. .r ,., , <br />:Sr~~u~ ~ :~."~ ._k . ~.." . . ~''_~' .. ~-'~:.: . . ~.:~ .:..~~. ~ Y:::: .. <br />. ~..:-. ' <br />Completed: 6 months after Project Initiation <br />TASK 6: FINAL MASTER PLAN <br />Task 6 pulls together a11 the informarion and work products from Tasks 1-5 for <br />the purpose of constructing a Final Master Plan and a recommended set of <br />Design Guidelines for the Southem Orange Campus site. Upon approval of a <br />Master Plan by the Orange County Boazd of Commissioners, the consultant will <br />prepaze a submittai to the Town of Chap~l Hill to modify the existing Special <br />Use Permit for the site. The consultant team and staff will work to take the <br />Modificarion application through the Chapel Hill review and approval process, <br />5outhern Orarge Camp~s Maste~ Plan pago ~~ <br />