Browse
Search
Agenda - 05-15-2012 - 5k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 05-15-2012 - Regular Mtg.
>
Agenda - 05-15-2012 - 5k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2012 2:43:37 PM
Creation date
5/11/2012 2:43:23 PM
Metadata
Fields
Template:
BOCC
Date
5/15/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5k
Document Relationships
2012-112 AMS - Clarion Associates LLC - Southern Master Plan Clarion Associates LLC
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2012
Minutes 05-15-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 <br />, ~, <br />.•~ <br />s C L A R i O N <br />.. ~R. ~._ ._,._ _.,._ . __ ...__._ .._.. <br />_ . ._._.... ------~ ~ <br />TASK 4: CONCEPT PLANS <br />Based upon the previous plans and visions for development of thTs site, ideas <br />and concems growing out of the public outreach efforts, and in considerarion of <br />Orange County's needs for additional facilities in this part of the County, <br />conceptual development scenarios will be prepared for the site. Three <br />alternative concepts will be prepared, showing different levels of intensity, <br />different configurations of buildings, and different parking strategies. Estimates <br />of likely vehicular traffic impacts of possible developmenf will be prepared, <br />along with analysis of fi~e possibilities for increased use of public transit, biking, <br />and walking as modes of transportation. Draft design guidelines will be prepared <br />for consideration, with ideas for pedestaan-oriented design of buildings and with <br />principles to be included in siting buildings. Emphasis witl be placed on <br />resiliency and sustainable design principles. A second Public Information <br />Meeting will be held to facilitate public review and comment on the alternatives. <br />~ f /i ~ s s <br />. _ Cur~ON T~An~.- . - , ; _... ORdrrGE Cdu-rrr STt~F. ` - <br />` <br />Preparation of 3 altemative concepts for development of the site <br />Describe advantages and disadvantages of each. Prepare discussion Review and comment on proposed alternattves, and <br />of likel trans ortation im acts of full develo ment of the site. work with consuttant in preparing conceptual plans. <br />Conduct a second Pubtic Event to review alternative concepts and Arrange for logistics and notifications for pu6lic <br />eticit comments. meeting. Assist in distributing materiak. <br />-:ScHmui:.e: - - <br />Completed: 5 months after Project Initiation <br />South=rn drarge CampLS hias~~r Flan Page i5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.