Orange County NC Website
28 <br />, ~, <br />.•~ <br />s C L A R i O N <br />.. ~R. ~._ ._,._ _.,._ . __ ...__._ .._.. <br />_ . ._._.... ------~ ~ <br />TASK 4: CONCEPT PLANS <br />Based upon the previous plans and visions for development of thTs site, ideas <br />and concems growing out of the public outreach efforts, and in considerarion of <br />Orange County's needs for additional facilities in this part of the County, <br />conceptual development scenarios will be prepared for the site. Three <br />alternative concepts will be prepared, showing different levels of intensity, <br />different configurations of buildings, and different parking strategies. Estimates <br />of likely vehicular traffic impacts of possible developmenf will be prepared, <br />along with analysis of fi~e possibilities for increased use of public transit, biking, <br />and walking as modes of transportation. Draft design guidelines will be prepared <br />for consideration, with ideas for pedestaan-oriented design of buildings and with <br />principles to be included in siting buildings. Emphasis witl be placed on <br />resiliency and sustainable design principles. A second Public Information <br />Meeting will be held to facilitate public review and comment on the alternatives. <br />~ f /i ~ s s <br />. _ Cur~ON T~An~.- . - , ; _... ORdrrGE Cdu-rrr STt~F. ` - <br />` <br />Preparation of 3 altemative concepts for development of the site <br />Describe advantages and disadvantages of each. Prepare discussion Review and comment on proposed alternattves, and <br />of likel trans ortation im acts of full develo ment of the site. work with consuttant in preparing conceptual plans. <br />Conduct a second Pubtic Event to review alternative concepts and Arrange for logistics and notifications for pu6lic <br />eticit comments. meeting. Assist in distributing materiak. <br />-:ScHmui:.e: - - <br />Completed: 5 months after Project Initiation <br />South=rn drarge CampLS hias~~r Flan Page i5 <br />