Browse
Search
Agenda - 05-15-2012 - 5g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 05-15-2012 - Regular Mtg.
>
Agenda - 05-15-2012 - 5g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2015 9:02:26 AM
Creation date
5/11/2012 2:34:16 PM
Metadata
Fields
Template:
BOCC
Date
5/15/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5g
Document Relationships
Minutes 05-15-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section I <br />2. <br />3. <br />B. Building Capacity <br />Responsible Entity for Suggesting Change - The Planning Directors, School Representatives, <br />Technical Advisory Committee (SAPFOTAC) will receive requested changes that are CIP <br />related and adopted in the prior year. CIP capacity changes will be updated along with actual <br />membership received in November of each year. <br />Other changes will be sent to a`Joint Action Committee' of the BOCC and Board of Education, <br />as noted in the MOU, who will make recommendations and forward changes (on the specific <br />forms with justification) to the full Board of County Commissioners for review and action. <br />These non-CIP changes would be updated in the upcoming November CAPS system <br />recalibration and included in the SAPFOTAC report. <br />Definition- "For purposes of this Memorandum, "building capacity" will be determined by <br />reference to State guidelines and the School District guidelines (consistent with CIP School <br />Construction Guidelines/policies developed by the School District and the Board of County <br />Commissioners) and will be determined by a joint action of the School Board and the Orange <br />County Board of Commissioners. As used herein the term "building capacity" refers to <br />permanent buildings. Mobile classrooms and other temporary student accommodating classroom <br />spaces are not permanent buildings and may not be counted in determining the school districts <br />building capacity." <br />Standard for: <br />Chapel Hill Carrboro School District <br />The original certified capacity for each of the <br />schools was certified by the respective <br />superintendent and incorporated in the initialization <br />of the CAPS system (Chapel Hill Carrboro School <br />District Apri129, 2002 - Base) <br />Capacity changes were made each year as follows: <br />2003: Increase of 619 at Rashkis Elementary. <br />2004: No changes at Elementa.ry, Middle, or High <br />School levels. <br />2005: No changes at Elementary, Middle, or High <br />Standard for: <br />Orange County School District <br />The original certified capacity for each of the <br />schools was certified by the respective <br />superintendent and incorporated in the <br />initialization of the CAPS system (Orange <br />County School District April 30, 2002 - Base) <br />Capacity changes were made each year as <br />follows: <br />2003: No net increase in capacity at <br />Elementary level. No changes at Middle <br />School level. Increase of 1,000 at Cedar Ridge <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.