Orange County NC Website
oZo jz_ ro a <br />~9~+Z S <br />[Departmental Use Only] ~ ~ ` ~ 3' s ~ > > <br />TITLE Sportsplex Locker Flooring ~ J <br />FY FY11-12 <br />NORTH CAROLINA <br />ORANGE COUNTY <br />CONSTRUCTION AGREEMENT UNDER $1,000,000.00 <br />THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 27th day of <br />April, 2012, by and between N.I.C.E. and Green, (hereinafter called the "Contractor"), and Orange County, a <br />body politic and a political subdivision of the State of North Carolina, (hereinafter called the "Owner"). <br />WITNESSETH: <br />That the Contractor and the Owner, for the consideration herein named, agree as follows: <br />1. CONTRACT DOCUMENTS; PRIORITY <br />The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br />Construction Drawings and Written Specifications. The Contract Documents form the Contract and are fully <br />incorporated herein. In the event of any inconsistency between or among the Contract Documents the <br />Contract Documents shall be interpreted in the following order of priority: <br />a. This Agreement. <br />b. Designer Approved Bulletins and/or Field Orders. <br />c. Request for Proposals and addenda thereto. <br />d. Proposal. <br />2. SCOPE OF WORK <br />The Contractor shall furnish and deliver all of the materials, and perform all of the work required by <br />this Agreement within the time period stipulated in a written Notice-to-Proceed to be executed by the <br />Contractor and Owner and in accordance with the following enumerated documents, which are made a part <br />hereof as if fully contained herein: <br />a. Construction Drawings prepared by N/A (Sheet dated <br />b. Written specifications prepared by the project engineer. <br />c. Flooring and wall proposal dated April 2, 2012, responding to bid #1651 (attached) which <br />fully describes the work to be performed, such work (hereinafter called the "Work"). <br />d. Related documents listed under Section 1 above. <br />3. TERM AND SCHEDULING <br />a. The Contractor agrees to commence work pursuant to the written Notice-to Proceed. <br />b. The Contractor agrees to complete substantially all Work included by June 3rd, 2012. <br />Revised November 2011 <br />