Browse
Search
2002 S ERCD - TRC Garrow Associates, Inc. for a Cultural and Archaeological Survey
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2002
>
2002 S ERCD - TRC Garrow Associates, Inc. for a Cultural and Archaeological Survey
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2012 8:21:51 AM
Creation date
5/2/2012 8:21:47 AM
Metadata
Fields
Template:
BOCC
Date
12/10/2002
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
8e
Document Relationships
Agenda - 12-10-2002-8e
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2002\Agenda - 12-10-2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The final task consists of reporting the findings of the study. During the performance of the first three <br />tasks, TRC will keep the Orange County ERCD informed of the progress of the work on at least a bi- <br />weekly basis through verbal reports. The Orange County ERCD will also be provided specific <br />information regarding the Cate Farmstead and log cabin sites prior to the completion of fieldwork. <br />Approximately halfway through the project we will provide a Preliminary Field Report that presents the <br />project findings to date; preliminary mapping of identified resources; a preliminary assessment of the <br />significance of any recorded resources; information on the work remaining; and the expected date of <br />completion of the final report. We will also prepare a brief (15-20 minute) presentation of the <br />preliminary project results for the Chapel Hill Township Park and Educational Campus Master Plan <br />Work Group by this time. <br />When the fieldwork and analysis is complete, TRC will produce draft and revised final versions of a <br />technical report detailing the results of the background research, fieldwork, and laboratory analysis. The <br />repoR will be thorough and complete and will be illustrated with photographs and drawings of <br />archaeological sites and artifacts, as needed, and will conform to the reporting standards presented in the <br />OSA guidelines. In addition to the report, updated or new archaeological site forms will be completed for <br />each recorded site or isolated find, as appropriate. The report will provide recommendations concerning <br />the significance of any cultural resources discovered, as well as recommendations for future survey and <br />management and/or investigation of these resources. Any additional investigations are beyond the scope <br />of the present proposal. <br />TRC will temporarily curate any artifacts recovered during production and review of the draft and final <br />reports. The permanent curation repository of all project materials and collections will be determined in <br />consultation with the client and the OSA, but will likely be the Office of State Archaeology Research <br />Center in Raleigh. Orange County ERCD will be responsible for curation costs for records and artifacts <br />resulting from the project and this cost is not included in the attached budget. <br />SCHEDULE <br />TRC will proceed with this project in an expeditious manner once written Notice to Proceed (NTP) is <br />received. Barring circumstances beyond our control, such as extended periods of adverse weather, the <br />background research and fieldwork is expected to be completed within three weeks. The Preliminary <br />Field Report will be prepared and submitted to the Orange County ERCD by February 4, 2003. Two <br />copies of the Draft Final Report will be submitted to the Orange County ERCD no later than February <br />14, 2003. The report will be revised as necessary and four copies of the Revised Final Report will be <br />submitted to Orange County ERCD no later than February 28, 2003. The Orange County ERCD will also <br />be provided with copies of all field maps and copies of all black and white photographs. <br />BUDGET <br />TRC proposes to complete these studies on a lump sum basis as requested in the RFP. The attached <br />budget provides details on our proposed costs by task. Invoices will be provided every month for the <br />duration of the project. <br />Page - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.