Browse
Search
Agenda - 05-03-2012 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 05-03-2012 - Work Session
>
Agenda - 05-03-2012 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2015 12:16:03 PM
Creation date
5/1/2012 9:36:13 AM
Metadata
Fields
Template:
BOCC
Date
5/1/2012
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 05-03-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ti~~~- ~ 3 <br />ORANGE COUNTY, DURHAM COUNTY and RESEARCH TRIANGLE REGIONAL <br />PUBLIC TRANSPORTATION AUTHORITY <br />INTERLOCAL AGREEMENT <br />COST SHARING FOR LRT RAIL PROJECT <br />This Interlocal Agreement ("Agreement") dated , 2012 is <br />entered into by and between Orange County ("Orange"), a political subdivision of the <br />State or North Carolina and Durham County ("Durham"), a political subdivision of the <br />State of North Carolina, and Research Triangle Regional Public Transportation <br />Authority, d/b/a Triangle Transit ("lTA"). Durham, Orange, and TTA may be referred to <br />individually as "Party" and collectively as "Parties". <br />Whereas, the Parties each desire to provide for the future transportation needs of <br />Durham and Orange, understanding that enhanced mobility options will support a high <br />quality of life, strengthen economic development, and enhance sustainability; and <br />Whereas, Durham and Orange mutually desire to support and share the costs for <br />the planning, construction, operation, and maintenance ("Costs") of a 17.3 mile <br />passenger rail service running from Durham to Orange along a corridor as outlined in <br />Attachment One, containing 16 stations, four of which are located in Orange County, <br />and utilizing light rail vehicles (`LRT Project"} as an important element in meeting their <br />future transportation needs and supporting efficient, sustainable development patterns; <br />and <br />Whereas, the Farties acknowledge that the LRT Project will be managed, <br />planned, constructed; maintained'and operated by the TTA according to the Bus and <br />Rail Investment Plans ("BRI Plans") asadopted or subsequently modified by the <br />Parties; and <br />Whereas, pursuant to NCGS 105-510 and 105-561 revenues to fund the <br />construction, maintenance and operation of the LRT Project will be collected and <br />distributed by TTA; and <br />Whereas the Parties have bargained to agreement on an equitable division of <br />responsibility to pay for the Costs of the LRT rail project. <br />Now therefore, in light of the mutual covenants contained herein and provided <br />that the LRT Project moves through planning and construction as set forth in the BRI <br />Plans, the Parties hereby agree as follows: <br />1. The total capital cost for the LRT Project through 2035 is now estimated to be <br />$1.378 billion dollars. Over the coming years the Parties acknowledge that <br />the LRT Project will move from preliminary to final design, which will result in <br />a more precise project description and more accurate capital costs. As a <br />result of this and as with any major capital project planned and constructed <br />Page ~ 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.