Orange County NC Website
31 <br /> 1 Expansion of pedestrian/bicycle recommendations <br /> 2 Further analyzed and developed roadway design options <br /> 3 ■ Modified functional design recommendations and phasing <br /> 4 ■ Addressed neighborhood concerns <br /> 5 ■ Recommended 15-501 interchange modifications <br /> 6 ■ Coordinated with Light Rail alignments <br /> 7 <br /> 8 Land Use Concept—map <br /> 9 <br /> 10 Park-and-Ride Strategy <br /> 11 - Multiple markets\ <br /> 12 o Regional commuters <br /> 13 o Satellite parking for constrained destinations <br /> 14 o Transit/light rail commuters <br /> 15 - Dispersed park-and—ride opportunities to capture markets <br /> 16 - Reduced future park-and-ride capacity at Leigh Village <br /> 17 - Phased approach <br /> 18 <br /> 19 Transit Recommendations <br /> 20 Short Term <br /> 21 - Expand local service <br /> 22 - Create better regional connections <br /> 23 - Express bus to serve Park and Ride outside of corridor <br /> 24 <br /> 25 Long Term <br /> 26 - Enhanced bus provides fast connections to major transit generators <br /> 27 - Increased bus service north of the corridor <br /> 28 - LRT connects corridor with region <br /> 29 - Flex route shuttle service for low density area <br /> 30 <br /> 31 Light Rail <br /> 32 ■ Alignment C-1 and C-2 are still viable alternatives <br /> 33 ■ Roadway designs reflect C-1 alignment; however, C-2 alignment will work with minor <br /> 34 design changes <br /> 35 ■ Additional traffic analysis may be needed if C-2 is selected as preferred alignment <br /> 36 ■ Neither the C-1 or C-2 alignment is in direct conflict with NC 54 recommendations <br /> 37 <br /> 38 Bicycle& Pedestrian Recommendations <br /> 39 - Cohesive, connected network <br /> 40 - On-road and off-road facilities <br /> 41 - Pedestrian emphasis areas <br /> 42 - Intersection at grade and grade-separated crossing treatments <br /> 43 - Pedestrian signals <br /> 44 <br /> 45 Roadway Recommendations <br /> 46 - Complete collector street connections <br /> 47 - Widen NC 54 to six lanes <br /> 48 - Improve capacity through superstreet design and grade separation <br /> 49 - Address critical issues at 1-40 interchange <br />