Orange County NC Website
23 <br /> County. This will have far-reaching benefits obtainable within one to three years by bringing <br /> passenger rail services as well as connecting existing and planned bus services, to serve our <br /> entire county. <br /> Because we want to help you make the tax referendum work, we ask both the County Board and <br /> Town Board to communicate their mutual approval of this to each other as soon as possible, and <br /> subsequently to the public when promoting the upcoming tax referendum. We also plan to <br /> promote this on a grassroots level. <br /> Orange County and Davidson County are the only counties along North Carolina's current <br /> passenger rail line where the train does not stop. Davidson County may soon add a train station, <br /> leaving Orange County as the only county without access to one of the fastest growing train <br /> services in the Southeast. One of our local residents was recently heard saying, "It's like having <br /> a super-highway passing through our county with no exit in our county." <br /> We trust you will unite with your colleagues to continue your support for the Orange County Train <br /> Station as a joint venture between Orange County and the Town of Hillsborough, for the reasons <br /> listed on the following page. <br /> We thank both the Orange County Commissioners and the Hillsborough Town Board Members <br /> for all their continued support towards this train station effort. <br /> Let us know how together we can help encourage the passage of this referendum. <br /> Support for Passing the %-cent Transportation Tax — Benefits of Orange County Train <br /> Station in Hillsborough <br /> The train station in Orange County/Hillsborough benefits the citizens across the entire county to <br /> access the existing 6 passenger trains that travel through Orange County daily. Hillsborough is <br /> in the geographic center of Orange County making the planned train station accessible to all of <br /> our seven townships. <br /> A passenger train station in Orange County/Hillsborough, as a new transportation service, <br /> supports economic development and transit-oriented development. <br /> The train station can be achieved in 1-3 years. Relatively little needs to be done to open the train <br /> station (platform, modular station). <br /> Cost estimates for Phase 1: temporary train stop with covered permanent platform and modular <br /> station = $2 million. Phase 2: permanent train station = $5-6 million. Does not include road <br /> infrastructure, but does include sufficient parking for both Phases, on the land already purchased. <br /> A train station in Orange County supports tourism, one of the major economic drivers for our <br /> county. <br /> Our own train station located adjacent to existing bus routes will easily connect to UNC, its <br /> hospitals in Chapel Hill and Hillsborough (in 2015); the Orange County campus of Durham <br /> Technical Community College; and sporting, cultural events and festivals in Hillsborough, <br /> Carrboro, and Chapel Hill. These train-bus connections will serve residents, tourists, students, <br /> alumni, commuters, and area businesses. <br /> Our schools will be able to take students on trips without running their own buses or contracting <br /> bus services. Many school systems throughout North Carolina already take students by these <br /> trains to museums, historic sites, and cultural activities. <br /> In the future, connections to planned expanded bus services will enable access by train to <br /> education and jobs. This would provide opportunities for people who are currently underserved, <br /> including rural residents, students, and unemployed residents. <br /> An increase in ridership of the Orange County 420 buses and the Hillsborough Circulator buses. <br /> Both of these run in close proximity to the land already set aside for the train station. Expanded <br /> bus services will therefore include access to/from Chapel Hill, Hillsborough, Mebane and rural <br /> Orange County from/to the train station. <br /> Potential significant cost savings to Orange County with a reduced need to transport people from <br /> Orange County to multiple locations for medical appointments throughout Durham. The 6 <br /> existing trains already stop in Durham. <br /> The land for the train station has been purchased and is waiting for infrastructure so the train can <br /> stop where it already passes by six times a day, with more trains planned in the next year. <br />