Browse
Search
NS ORD-2002-033 Telecommunications Tower Ordinance Amendments
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2002
>
NS ORD-2002-033 Telecommunications Tower Ordinance Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2017 12:24:36 PM
Creation date
4/26/2012 10:39:16 AM
Metadata
Fields
Template:
BOCC
Date
12/2/2002
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
9a
Document Relationships
Minutes - 20021202
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADMINISTRATION ORDINANCE 17 <br />2) Inspection records shall be kept by the tower owner <br />and made available upon request to the Inspections <br />Division during regular business hours. <br />a) The following inspection schedule shall be <br />followed except in cases where a tower has no <br />structures other than those associated with <br />telecommunication tower use located within the <br />tower's fall zone. At least once every thirty - <br />six (36) months, or thirty -six (36) months <br />from the date of a co- location approval, a <br />structural engineer who is regularly involved <br />in the maintenance, inspection and /or <br />erection of telecommunications towers shall <br />inspect the tower and submit a report <br />submo ted to the Inspections Division within <br />a reasonable time thereafter. At a minimum, <br />this inspection shall be conducted in <br />accordance with the provisions of this <br />Ordinance and in accordance with the tower <br />inspections check list provided in the EIA- <br />222 (as amended from time to time). This is <br />considered a major inspection review. <br />b) At least once every twelve (12) months, a <br />visual inspection from the ground shall be <br />conducted by a properly trained staff <br />member of a tower provider or tower <br />consultant and a report shall be filed with the <br />Inspections Division within a reasonable <br />time thereafter. This inspection shall include, <br />but shall not be limited to, visual inspection <br />of tower foundations, structures, guys, and <br />connections for evidence of settlement or <br />later movement; soil erosion; condition of <br />paint or galvanizing; rust or corrosion, loose <br />or missing bolts, loose or corroded lightning <br />protection connectors; tower plumbness, <br />significant variation in guy sags (i.e. <br />tensions), and other material areas or <br />matters relating to the.structural integrity of <br />the tower. This is considered a minor <br />inspection review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.