Orange County NC Website
I ..v..n.....w.......~_......~..:u..~+..u.a~a~~N.u.~.us~+....w..u.+..........~.•..e....+w..~..w..»w...u~az.uva~u~v.v.ui~w.~nasvtn.nav.ss.»uu~~ttwuKfcv.~eu~~x~p~iv.~~u.u•ss~xtt~t~ikitt4atlYiSVtitu:lUttS.~E.lialCNll\tlf.~wetitl~Y\1t111i1Yi1Ii1T\lllSiriS.lilt61;5:4lYilti)iIIYli41illl'.lYDiBi\ii:lUillli1tk11iv]:LilI~1t34JS6X6UlS:S1Z1.1C1S.;51i;~ilC?i.L=;Sliis3~ ~~:r1va4 <br />0 ~ ~ <br />event adjustments or substitutions are needed <br />until the mitigation area is established; and _ <br />~ A fmancial guarantee is required for the total <br />cost of the mitigation project. Once the <br />~installation is complete, thirty percent (30%) of <br />the amount of the letter of credit or escrow will <br />be held for twelwe (12) months or until the site is <br />established, whichever is greater. <br />g) Drainage <br />1) All dra'~nage structures will be installed and <br />maintained according to the approved <br />Stormwater Management Plan. <br />2) Subdivisions that include retention/detention <br />ponds shall comply with the requirements in <br />Section 6.23.4, Operation and Maintenance of <br />Structural Best Management Practices. <br />h) Grading and Erosion Control . <br />1) Plans for grading and erosion control comply <br />with standards contained in the Orange County <br />Erosion and Sediment Control Ordinance and <br />Manual; <br />2) Construction is phased to the extent practical to <br />m~nimiye disturbance and sedimentation; <br />3) Sediment control measures will be properly <br />installed to filter sediment from runoff during <br />construction and maintained until grading is <br />complete and a permanent vegetative cover has <br />been established and all slopes stabilized; and <br />4) Permanent landscaping, groundcover, mulch, <br />etc. will be installed as soon as practical after <br />construction activities for each phase are <br />completed. <br />i) , Solid Waste Management <br />The Solid Waste Management Plan submitted as part of <br />the Resources Management Plan shall include the <br />io <br />