Browse
Search
P ORD-2002-030 Telecommunications Tower Ordinance Amendments
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2002
>
P ORD-2002-030 Telecommunications Tower Ordinance Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 2:09:00 PM
Creation date
4/23/2012 4:48:01 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2002
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
9b
Document Relationships
Minutes - 20021106
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f ORDINANCE TO PLANNING BOARD (DRAFT) 62 <br />h4) <br />The applicant shall, after submission of an application for a Special <br />Use Permit, arrange to fly, or raise upon a mast, a minimum of a <br />three -foot (11)1n diameter, brightly colored red or orange balloon at <br />the maximum height of the proposed new tower. A notice of the <br />dates (including a second date in case of poor visibility, weather or <br />atmospheric conditions on the Initial date), times, and location of <br />the balloon test shall be mailed, by certified mail return receipt <br />reouested, by the applicant, to all persons owning property within <br />1,000 feet of the subject parcel no less than fourteen (14) days in <br />advance of the first test date. The applicant shall inform the County <br />Planning Staff, in writing, of the dates and times of the test at least <br />fourteen (14) days In advance. The balloon test shall be flown for at <br />least four (4) consecutive hours sometime between 7:00 A.M. and <br />4:00 P.M. on the dates chosen. The primary date shall be on a <br />weekend, but to prevent delays in the processing of the application, <br />and in case of poor weather or atmospheric conditions on the initial <br />date, the secondary date may be a weekday. The applicant as <br />evidence that this requirement has been met shall submit a <br />• -i J a a o <br />visible balloon float <br />height of the tower, <br />eq at the proposed tower location to the maximum <br />look like. shall be submitted no later than ten (10) days prior to the <br />public hearing.. Photographs shall be taken from locations such as: <br />property lines, and/or nearby residential areas, historic sites, roadways, <br />including scenic roads and major view corridors, and other locations as <br />deemed necessary by the Planning Staff to assess the visual impact of <br />the proposed tower. <br />i-j) The Special Use Permit application shall include a statement that the <br />facility and its equipment will comply with all federal, state and local <br />emission requirements. <br />J <br />k) All buildings and other structures to be located on the same <br />property as a telecommunication tower shall conform with the <br />setbacks established for the zoning district or as established <br />through the subdivision process. <br />
The URL can be used to link to this page
Your browser does not support the video tag.