Browse
Search
P ORD-2002-030 Telecommunications Tower Ordinance Amendments
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2002
>
P ORD-2002-030 Telecommunications Tower Ordinance Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 2:09:00 PM
Creation date
4/23/2012 4:48:01 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2002
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
9b
Document Relationships
Minutes - 20021106
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADMINISTRATION ORDINANCE 23 <br />2) Delineation of the boundaries of the maximum search range <br />within which the telecommunication teweF equipment can <br />function as intended. The following information shall be provided <br />for all existing towers within the search range: <br />(a) Telecommunication tower height, as measured from <br />the <br />base of the tower to the highest point of the <br />proposed antenna(s), Including, lightning rods, to be <br />located atop the tower structure; <br />(b) Existing and planned tower users; <br />(c) Whether the existing tetecomriit -I tca im- tower could <br />accommodate the tetecoi mtin *4ikuipment <br />aeteRRa to be attached to the proposed tower without <br />causing structural instability or radio frequency <br />interference; and <br />(d) If the proposed telecomn4t nic t eq fit <br />aRteana cannot be accommodated on the existing <br />telecommunication tower, assess whether the existing <br />tower could be structurally strengthened or whether the <br />antennas transmitters and related equipment could be <br />protected from electromagnetic interference, and <br />generally describe the means and projected cost of <br />shared use of the existing tower; and <br />(e) any restrictions or limitations of the FedeFal <br />FCC or FAA that would <br />Preclude the shared use of the tower; and <br />(f) any additional information requested by the County. <br />3) A summary explanation of why proposed telecommunication <br />equipment facilities cannot be located on any of the existing <br />towers in the search range. <br />e f) Documentation from applicable state or federal agencies indicating <br />requirements which affect the appearance of the proposed tower, such <br />as lighting and coloring. <br />€ g) Draft le#SF-ef eFedit bond which will guarantee the removal of the tower <br />in the event that it is abandoned or unused for a period of 12 months. <br />g h) A listing of, and current tax map identifying, all property owners within <br />1000 feet of the parcel shall be provided. Addressed, first class <br />stamped envelopes to said property owners shall be submitted with <br />the application. Each property owner shall be notified of the public <br />hearing in accordance with Article 2.3.3.4 (Class B Special Use Permit) <br />or Article 8.4.5 (Class A Special Use Permit) of this Ordinance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.