Browse
Search
P ORD-2002-030 Telecommunications Tower Ordinance Amendments
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2002
>
P ORD-2002-030 Telecommunications Tower Ordinance Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 2:09:00 PM
Creation date
4/23/2012 4:48:01 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2002
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
9b
Document Relationships
Minutes - 20021106
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADMINISTRATION ORDINANCE 16 <br />5) a written affidavit stating why "the proposed site is <br />necessary for their communications service" (e.g., for <br />coverage, capacity, hole - filling, etc.) and a statement <br />that there are no existing alternative sites within the <br />provided search area and there are no alternative <br />technologies available which could provide the <br />proposed service enhancement without the tower. <br />a) County staff will utilize the services of a registered <br />professional engineer to confirm the statement <br />made in item 5) above. No tower shall be permitted <br />to exceed its designed loading capacity. For all <br />towers attached to existing structures, the statement <br />shall include certification that the structure can <br />support the load superimposed from the tower. All <br />towers shall have the capacity to permit multiple <br />users; at a minimum monopole towers shall <br />accommodate two (2) users and self- supportliattice <br />or guyed towers shall, at a minimum accommodate <br />three (3) users. <br />91 Standards of evaluation. <br />1) Tower height shall be measured from the base of the <br />tower to the highest point of the proposed <br />antenna(s), wO /igtftenalg;cod to be located atop the <br />tower structure. <br />2) Telecommunications towers shall conform with all of <br />the requirements of Sections 8.8.17a.1a (a:g) and <br />8.8.17a.2 of the Zoning <br />Ordinance. <br />3V: All towers shall be engtneered to allow for-co= <br />locations. No co - locator shall` be refused access for <br />co- location by charging exorbitant: lease fees. <br />Public safety co-locations- shall take priority over <br />other co- locators. <br />4, A toyer consultant shall provide Staff 'assistance on <br />exorbitant rate leases. <br />f1 Tower Inspection. <br />1) Telecommunication tower owners shall submit a <br />report to the County Inspections Division certifying <br />structural and electrical integrity upon completion of <br />the initial construction and at intervals as specified <br />in this Section <br />
The URL can be used to link to this page
Your browser does not support the video tag.