Browse
Search
2012-086 AMS - Norment Security Group, Inc. for Upgrade of Security System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-086 AMS - Norment Security Group, Inc. for Upgrade of Security System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2012 5:01:22 PM
Creation date
4/20/2012 9:13:47 AM
Metadata
Fields
Template:
BOCC
Date
4/20/2012
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Mgr Signed
Document Relationships
2012-086 S AMS - Norment Security Group $144,789
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~~~~~ <br />SE~URIT1f GRO~.1P, IN~_ <br />UCJS 11-S53G <br />09202011 Control System Migration <br />DATE: September 20, 2011 <br />TO: Sheriff Lindy Pendergrass <br />PROJECT: Control System Migration <br />LOCATION: Orange County Jail, Hillsboro, NC <br />ARCHITECT: N/A <br />At the request of the facility, Norment surveyed the IDEAS control system installed approximately 1998. The <br />IDEAS control equipment is no longer in production and is no longer supported. We are offering a migration <br />solution to an off-the-shelf PLC product. Along with the migration to a PLC system we will replace the hard <br />graphic control panels with new Touch Screen control units with gooseneck IC master stations. We Propose the <br />Following: <br />Scope of Work <br />Part 1- Furnish and install the work as designated below, except as specifically excluded under Part 2: <br />1.1 - Replace IDEAS Control Modules <br />• Furnish and install an off-the-shelf industrial PLC control system to replace the existing IDEAS <br />system. <br />• Furnish and install a remote PLC UO unit in the old Control Room for the doors connected to the <br />old graphic panel. <br />• Furnish and install new control cabling as necessary. <br />• Furnish and install three (3) Touch Screen control stations. Two (2) in new control room #103, one <br />(1) in old control room. <br />• Program Touch Screen stations to have the same control functions as the current hard graphic <br />panels. <br />1.2 - Intercom System <br />Furnish and install an upgrade Intercom System. <br />• Furnish and install Intercom cabling as necessary. <br />• Furnish and install a gooseneck style master station at each of the three Touch Screen stations. <br />1.3 - UPS Backup Power - 10 Minute Runtime <br />• Furnish and install UPS backup in the main PLC equipment rack to backup the PLC head-end. <br />Please sign and return one copy For our ~les. <br />This proposal is subject to acceptance with in 30 days from We hope this proposal will merit your placing with us your <br />the date hereon, and to all standard terms and conditions noted business, which will have our best attention in pursuing the <br />on the attached page. work to completion. <br />By: Mike Suriano <br />Accepted: <br />Firm: <br />East Coast Reeional fl#fice <br />62~ ~t`>o1e Drive, Garnet.l~iC 27529 <br />anon+e fi~i~y rt~a~oasa ~ax t~~~~ r.+~-o~~ <br />www.narment~eeueity.com <br />2of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.