Browse
Search
2012-086 AMS - Norment Security Group, Inc. for Upgrade of Security System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-086 AMS - Norment Security Group, Inc. for Upgrade of Security System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2012 5:01:22 PM
Creation date
4/20/2012 9:13:47 AM
Metadata
Fields
Template:
BOCC
Date
4/20/2012
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Mgr Signed
Document Relationships
2012-086 S AMS - Norment Security Group $144,789
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~~~~~ <br />SE+~URITY ~GRt~~,JP, INC_ <br />~ ~z-~~~ <br />0920201I Control System Migration <br />• Furnish and install UPS backup on the Touch Screen units. <br />1.4 - Remove Old Panels <br />Remove old panels and turn over to Owner for disposal. <br />Part 2- We specifically exclude the following: <br />2.1 - Any excavating and concrete work. <br />2.2 - Provision of any conduit, electrical boxes and pull strings. <br />Part 3 - Clari~cations: <br />3.1 - Camera call-up is not a current function of the graphic panels and is not included in this proposal. <br />3.2 - The three (3) graphic panels located in Control Room 103 will be consolidated to two (2) ToucY- <br />Screen units. <br />3.3 - The two graphic panels located in the existing jail control room will be consolidated to one (1) Touch <br />Screen unit. <br />3.4 - Main PLC head-end equipment may be located in Mechanical Room 211. <br />3.5 - Norment will reuse the existing doar locks. <br />3.6 - Norment will reuse the existing IC stations and Intercom amps as necessary. <br />3.7 - After migration is fully engineered any conduit requirements will be forwarded to the Owner. <br />Part 4 - General Notes: <br />4.1 - Upon acceptance of this proposal Norment will provide the customer, during the initial warranty <br />period, our 24/7 on-call technical phone number. <br />4.2 - For this project Norment will provide its standard General Liability Insurance. (Certificate furnished <br />upon request) <br />4.3 - We are not responsible for broken or damaged glass, metal or other materials (except that caused by <br />our own employees) nor for the protection of same. <br />4.4 - We will perform periodic clean-up of waste generated by our work and deposit debris into containers <br />or dumpsters provided by others <br />4.5 - Suitable secured dry storage space is to be provided by the Owner for our materials and protection of <br />same. <br />4.6 - Payment & Performance Bonds are not included. <br />4.7 - Norment has included NC sales tax. <br />Base Bid Total - $144,789.00 <br />Please sign and return one copy for our files. <br />This proposal is subject to acceptance with in 30 days from We hope this proposal will merit your placing with us your <br />the date hereon, and to all standard terms and conditions noted business, which will have our best attention in pursuing the <br />on the attached page. work to completion. <br />By: Mike Suriano <br />Accepted: <br />Firm: <br />Eas# Goast Reeional O##ice <br />621 PooQe Drive. Gdrner, ~UC 33529 <br />Pf~one (9i~9) 779-OOt15, fax ~919j ?79-0351 <br />v-*r~nr.nornseat~s~curit,y.com <br />3of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.