Orange County NC Website
Installation and Service Manual Instruction Manual IMOEV00002E <br />Leve12AC Pow-R-StationT"" ElectricVehicle EffectiveNovember2017 <br />Supply Equipment (EVSE} <br />8. Canfirming Installation and First Use <br />Charging #s~fi~star <br />Pow~r tr~3ict~L~csr I~inished tnd~~Eaat <br />Sertrice <br />i~ae~tax <br />FKeFnat~iy 7ernparary <br />C-verrid~ Button Contrr~IleK1 Fa~ult R~set Buttacs <br />tLr~f! Button} tndicator lrtdicatar d1~~~ht ~utinn~ <br />~ma~~.~ Ss~a-su~ I~i~~icar~ <br />Figure 16. Status indicators. <br />Step 4: Ensure thaT the electrical service wires are landad accord- <br />ing to this manual. Make sure the station access deor is <br />closed. <br />Step 2: Powar ON the Disiribution Breaker. <br />Step 3: During initial EVSE boot-up, the User interface will cycle all <br />ICONs. <br />Step 4: After boot-up, the Povr~er ICON ~vill be either STEADY or <br />BLINKING per above table. If this is not the case, please <br />verify tnat all incoming service connectians are landed <br />appropriately and that the dPstribution breaker is in-tact. Ifi <br />the Po~ver ICON still does not appear, please caR technical <br />support. <br />Step 5: 1f the Power ICON is BLINKING, Ruihorization is needed, <br />Please consult the Authorization section of this documert <br />below. !f the Pawer ICON is STEADY, piease proceed to the <br />next step. <br />Sxep 8: If a SAE J1772 Compliant El~ciric Vehicle is available, please <br />connect the EV Connactor to the Vehicle Iniet, You m~y also <br />use an Eaton Vshicle Simulator. <br />S#ep 7: 3he GHARGING INDICATOR will begin to blink. <br />Step 8: Almost immsdiately, the vehicle will engage a charge ses- <br />sion Sthe contactor wiil cfose and power will be supplied to <br />the vehicle). <br />SeeTable 1~: Normal Operation User fnierface Indicators, ;n <br />the Appendix, fio~ more deteils. <br />EATUIV CORPORATION www.eaton.com 71 <br />ICON 1CDN SYetus <br /> BGnk Steed <br />! ~ <br />#'`+.'..+~ <br />\ <br />Payment / Autharizatian Needed <br />Unit Ready for Charge Session <br />~ Vehicle Connected, EVSE Ready, <br />Waiting on Vehicle y~}~~cle Chazging <br />~ <br /> ~/A Vehicle Has Enda~ Gharge 1May begin <br />again at anytime) <br /> <br />~f Rate of Charge Contofled Remotety and Rate of Charge Conirotted Aemo#e!p and <br /> Chsrging Setto tNACT1YE Charging ACTIVE <br />