Browse
Search
2012-081 AMS - ALT Services Group for Electric Vehicle Charging Station $84,530
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-081 AMS - ALT Services Group for Electric Vehicle Charging Station $84,530
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:47:28 PM
Creation date
4/17/2012 8:45:10 AM
Metadata
Fields
Template:
BOCC
Date
4/17/2012
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager Signed
Document Relationships
2012-081 S AMS - ALT Services Group $84,530
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
insialiation and Service Manuai Instruction Manual IMOEVOOOt?2E <br />Level 2 AC Pow-R-Station7N1 Electric Vehicle ~tfective November 2011 <br />Supply Equipment (EVSE) <br />~~~~~ Of ~~.'Ct~Str~~ .`~`~~r'~~fOll <br />1.DC3 1.5t~~2y 5.15 1.sQ{2) <br />(REF) <br />~.5t3(3 (6) <br />~ ~ <br />#.~5{2) <br />~~ . <br />4.13~2) <br />~ - ~ . <br />'I ,DD(REF) <br />Figure 1i. Base Detail #or Pedestal EVSE. <br />Pedestal Floor Mounting <br />Preparing the Site <br />Once a proper site has bsen chnsen and the electrical service has <br />been run to the iocation, you can begin installation. <br />Step 1: Open door using the latch an the side of the unit. Ths key <br />will be secured inside the unit. <br />Step 2: Remove the bottom pan by puiling upward and then angiing <br />outward. Best if performed when door is held opened. <br />Step 3: The hole paitem for the base of the petiestal mount is <br />shown below in Figure 11. Use six, 3/8 UNC Grade 5 stain- <br />less bolts torqued at 5D ft-Ibs fot mounting base to the <br />ground. <br />Note: if using a concrete pad, pfease be mind?ul oi the overa}i height bf the <br />unit due to ADA CompGance. Please reference the ADA Compliance section <br />of this document. <br />7.Termination and Canfi~uration <br />~ WARNING ELECTRtCAL <br />WASNtN6 - LOGKOUTlfAGOUT ALl ELECTRICAL SDURCE CtRGUiTS <br />FEEAIM6 THE UNITIS) IN TNE UPEN POSITION B€~ORE BEGINNING <br />WlRING OR'tERM(N~lTiONS. FA[LURE TQ FOLLUW TNE INSTRUCTIONS <br />COULU RESULT IN SEVERE BDDILY I:NJURY UR DEATH. <br />WARNING - QNLY QUALfFiED PERSQNNEI. FAMELIAR W17H THE <br />pPERAT#QN AMD G4NSTHUGTION OF THIS EQUIPNIENT SHOULD INSTALI, <br />ADJUST, M01}EFl; kND &ERVICE THIS EElUIPMENL FAiLURE TO FQLLQW <br />THE INStRUCTiONS COULD RESUlT IN 5EYERE BOdILY INJURY OR [lEATH. <br />Wire Terminatians <br />For a typical irtstallation, ths only field wire terminations will be the <br />incoming electrical service wires. lf the EVSE unit is configured for <br />Pow-R-Station Network Manager or other remote management so1u- <br />tion, a standard CAT5/6 network cable or 3-wire shielded cabfe for <br />RS-4E5 Cflmmunications. <br />Elecirical Service Wires <br />Terminate the incoming elect~ica! seroice v~~ires to the Pow-R•Station <br />EVSE's provided terminal block, follov. ing the designations far eaeh <br />wire. L1, L2, and G(see Figure 121. <br />EATOT! CORPORATION www.eaton.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.