Browse
Search
2012-081 AMS - ALT Services Group for Electric Vehicle Charging Station $84,530
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-081 AMS - ALT Services Group for Electric Vehicle Charging Station $84,530
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:47:28 PM
Creation date
4/17/2012 8:45:10 AM
Metadata
Fields
Template:
BOCC
Date
4/17/2012
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager Signed
Document Relationships
2012-081 S AMS - ALT Services Group $84,530
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J/ t/~L17.1 L 3: L3 Y!9 ivn ~~ r r~ :~ ~wn ~ r r~»ss,r~ i ra~ ~ i a-avy-saz~ I 0: I Y5'L9",Sk1t~IL'L r~e r or ra <br />TECHNt7LOGY ENVIRC?NMENT FtaR EVSE REQUIREMENTS <br />Specify Applicabie Techni~al EVSE specitications, listing and testing such as: <br />SAE Standards me#: <br />~ SAEJ551 Electromagneticcompatilailitystandards <br />~ SAE J177'~TM Conductive 54pin coupling far EVSE <br />o SAE J1850 Communication network beriveen EVSEand fhe EV <br />~a 5AE J2178 Message formatfor the communication network <br />;~ 5AE J2293 Energy transfer system, umbrella documentfor EV standards <br />o SAE J2294 Onboa rd power charger quality <br />~a SAE J2836 Digitalcommunications use case between EVSE and vehicle <br />0 5AEJ2847 Digitalcommunicationsspec~cabons <br />UL Listed / T~ste~ <br />o UL 2202 Safety of EVSE <br />,~~ UL 2231 Shock prevention measures for EVSE <br />r, UL 2251 Safet t~f COrd Set <br />Circuit re-closure - remote or automatic re-energized after a fault has cleared <br />Cold load pickup (random restart after power outage) <br />Load management connectian (far future utility cantrol) <br />Input vQitage and amperage rang~ <br />Seff testing - diagnostics, safety, ground monitor, etc. <br />Diagnostic 5tatus indicator <br />t~perating temperature range <br />Mounting -wa1l, pedestal, other <br />EquipmenE must me~t the emerging open standard of the industry and avaids <br />pra rietar subscriber n~tworks <br />~quipment that can communicate the EVS~s availabilify is preferr~d yef not <br />Equipment that can accept payment is not necessary for this project but having the <br />ability to da so in the future is preferred <br />Charge status display <br />EVSE dimensions <br />EVSE footprint dimensions (for installafion) " <br />MAR-~7-2~12 10:26 Fram: <br />ID:~111 <br />Paae:007 R=93: <br />
The URL can be used to link to this page
Your browser does not support the video tag.