Browse
Search
2012-081 AMS - ALT Services Group for Electric Vehicle Charging Station $84,530
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-081 AMS - ALT Services Group for Electric Vehicle Charging Station $84,530
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2015 3:47:28 PM
Creation date
4/17/2012 8:45:10 AM
Metadata
Fields
Template:
BOCC
Date
4/17/2012
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager Signed
Document Relationships
2012-081 S AMS - ALT Services Group $84,530
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~irrrni~ s;-r,, ~n t~n~~ rro~: GF~IIit G[RMIY k~lt~i yi9-ti99-33L4 io: ~z5z~;~'zt Na~ s oe 2s <br />9. EV station must be capable of interacting with the communications driver, written by <br /> ActiveLogix f4r use ~rith the Pgriscope product, rur~ning on a Vycon JAGE engine and <br /> interfacing to the charging station through t~odbus RTU and Modbus TGP. EV <br /> station manufactu~er shai! exgose aIl registers/paints frorrt the EV station to the <br /> communications driver. <br />10. Products must complywith #he Sectian 1605 of the American Recovary and <br />Reinvestment Act of 2009. Bid~er must provide certification of compEiance. See ~ <br /> attached specifications. <br />91. Warranryshal! be a s#andard c~nrttmerciai warranty. Please statewarranty / <br />~ <br /> - r~..~-w,~ S <br />f <br />EVSE REQUIREMEIVTS <br />S.~gp[emental Snecifiaations - Electri~ Vehicle Supp[y ~quipment <br />Orange Caunty is seeking quality EVSEs far its countywide infirastructure. The selected EVSE <br />Pravider must be able to deliuer and service high quality products beyond the installation period. <br />Tha following tables contain a list c~f specific requirernents for the EVSE consideration that <br />should be addressed as part ~# the Bid response: <br /> Description: YES NO VftRIANCE <br />tt~ <br />~2~ E ui ment must be durable ta withstand area's extreme weather ,,~'" <br />13~ EVSEs that witl accomm~date the needs of the full range:of ~ <br /> vehicles requiring access ta <br />~4_ EVSEs tFrat universalty accommodate vshicle~ from all <br /> rnanufacturers, and that comply with all applicable bui{ding codes, <br /> SAE standards, UL safety codes, ADA requirements and ~ <br /> industr standards. <br />~5~ EVSEs that meet customers' EV charging needs in any or a[I <br /> key lo~ations including commercial garages and parking lots, ~ <br /> transit hubs, warkplace locations, and on-streef <br /> parking in residential neigh~orhoads. <br />~~~ Use o# "smart charging~ concepts to minimize charging during <br /> art-peak hours ~nd to maximize custflmer convenience, and ~ <br /> which are compatible with the utili#y industry's <br /> Advanced Me#~ring Infrastructure systems ("smart meters"} <br />~~~ Pr~vision ~f at#ractiue EW charging with conventional billing <br /> <br />rates far customers, and convenient billing systems, ~ <br />~$~ Consideration of ineans to accommodate the extended-range needs ~ <br /> of E1/ drivers, such as fast charging. <br />19. Provisions for maintenance requirements and other an~illary <br /> services rovided b v~ndor or distributer. <br />20. Warrant eriad far e ui ment and insta(lation of e ui ment. / ~. <br />MAR-07-z012 10:26 Fram: <br />SD:1111 <br />Pa9e:006 R=93~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.