Orange County NC Website
..................._.......I......._..... ................ ............................................ ............... <br /> approximately 232 acres land in the Buckhorn-Mebane area. The parcels are <br /> located in a Commercial-industrial Transition Activity Node (CITAN) and the <br /> rezoning is being proposed to prepare the area for eventual non-residential <br /> development. <br /> 2. Analysis <br /> ­­_...__._­................................................................._­................................. ...................................... ............................................................................................. <br /> As required under Section 2.8.5 of the Orange County Unified Development <br /> Ordinance, the Planning Director is required to: 'cause an analysis to be made of the <br /> application and, based upon that analysis, prepare a recommendation for <br /> consideration by the Planning Board and the Board of County Commissioners'. <br /> In analyzing this proposal, the following information is offered: <br /> 1. Staff has been directed by the Board of County Commissioners to pursue small <br /> area plan implementation with a focus on economic development priorities. This <br /> proposed rezoning conforms to the intent of the adopted Efland-Mebane Small <br /> Area Plan which recommends this area for non-residential and mixed use <br /> development. <br /> 2. The proposed rezoning further carries out Orange County actions over the past <br /> two years which included amendments to the Water and Sewer Management, <br /> Planning, and Boundary Agreement to designate this area as "Primary Service <br /> Area" and which changed the land use classification of a portion of this area to <br /> Commercial-Industrial Transition Activity Node (CITAN). (Note: a portion of this <br /> area has been designated CITAN on the Future land Use Map for many years). <br /> 3. The request for the amendment has been deemed complete in accordance with <br /> the requirements of Section 2.8 of the Unified Development Ordinance. <br /> 4. This area of the county is located within Orange County's "Primary Service Area <br /> as designated in the Water and Sewer Management, Planning, and Boundary <br /> Agreement (WASMPBA). The County is currently working with the City of <br /> Mebane on a revised interlocal agreement to provide water and sewer services <br /> to this area. In addition, sewer infrastructure planning for this area is well <br /> underway. <br /> 5. 'Pre-zoning' an area designates a specific general use zoning district to a parcel. <br /> Uses must be consistent with those allowed for the zoning district in the Table of <br /> Permitted Uses (Section 5.2 of the LIDO). By pre-zoning an area, property <br /> owners can proceed with development without a lengthy rezoning process but <br /> must still be in compliance with the standards required for the specific zoning <br /> district, any additional specific Use Standards (Article 5 of the UDO), the general <br /> development regulations required in Article 6 of the UDO, and the requirements <br /> for the specific Watershed Protection Overlay Zone (Section 4.2 of the UDO) in <br /> which the parcel is located. Divergence from the adopted development <br /> regulations cannot be approved or required unless an applicant wishes to submit <br /> to a conditional district rezoning process. <br /> 6. The area proposed for rezoning is adjacent to the Interstate 85/40 corridor. <br /> Access to the Interstate is currently via an interchange at.Buckhom Road; <br /> however, the construction of an interchange at Mattress Factory Road is part of <br /> an ongoing study by the Burlington-Graham Metropolitan Planning Organization <br /> (BGMPO). This study is the first step on potentially adding an interchange to <br /> state transportation improvement plans. Additionally, a future interchange............ . ..... _qe at <br /> 2 <br />