Browse
Search
Agenda - 04-17-2012 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 04-17-2012 - Regular Mtg.
>
Agenda - 04-17-2012 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2015 8:35:29 AM
Creation date
4/13/2012 4:24:33 PM
Metadata
Fields
Template:
BOCC
Date
4/17/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes 04-17-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
ORD-2012-011 Amendments to Unified Development Ordinance (UDO/Zoning 2012-08) – Stormwater
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6: Development Standards 25 <br /> Section 6.14:Stormwater Management <br /> (d) The Erosion Control Officer will peried+safly inspect each stormwater <br /> BMP approved pursuant to these rules approximately every five years. <br /> In the event the Erosion Control Officer discovers the need for corrective <br /> action of improvements, he/she shall notify the owning entity of the <br /> needed improvements and the date by which the corrective action is to <br /> be completed. All improvements shall be made consistent with the plans <br /> and specification of the stormwater control structure and the operation <br /> and maintenance plan or manual. After notification by the owning entity, <br /> the Erosion Control Officer shall inspect and approve the completed <br /> improvements. <br /> (5) Annual Maintenance Inspection Fee <br /> (a) The Fee for the first year shall be paid before: <br /> (i) The release of any Final Certificate of Occupancy for Non- <br /> Residential Properties. <br /> (ii) The release of the construction bond for Residential or Non- <br /> Residential Properties. <br /> (b) The fee shall be based upon the current Orange County Planning Fee <br /> Schedule, and shall be paid to Orange County following each annual <br /> inspection. <br /> (c) Failure to pay the Annual Maintenance Inspection Fee shall be deemed <br /> a violation of this Ordinance. <br /> 6.14.11 Amendments to Approved Plans and Specifications <br /> (A) Minor Amendments to Plans and Specifications <br /> (1) Amendments to the plans and specifications of the stormwater control structure <br /> and/or the operation and maintenance plan or manual may be approved by the <br /> Erosion Control Officer, provided that the changes do not involve a change in the <br /> size or location of the structure. <br /> (2) Proposed changes shall be prepared by a North Carolina registered professional <br /> engineer or landscape architect(to the extent that the General Statutes, Chapter <br /> 89A, allow)and submitted for review by the Erosion Control Officer. <br /> (3) Erosion Control Officer Review <br /> (a) If the Erosion Control Officer approves the proposed changes, the <br /> owning entity of the stormwater control structure shall file sealed copies <br /> of the revisions with the Erosion Control Officer. <br /> (b) If the Erosion Control Officer disapproves the changes, the proposal may <br /> be revised and resubmitted as a new proposal. If the proposal has not <br /> been revised and is essentially the same as that already reviewed, it <br /> shall be returned to the applicant. <br /> (c) The Erosion Control Officer shall report any such revisions to the Board <br /> of County Commissioners at the next available regular meeting. <br /> (B) Major Amendments to Plans and Specifications <br /> (1) Amendments to the plans and specifications of the stormwater control structure <br /> and/or the operation and maintenance plan or manual which involve a change in <br /> the size or location of the structure may be approved by the Board of County <br /> Commissioners after receiving a recommendation from the Erosion Control <br /> Officer. <br /> (2) Proposed changes shall be prepared by a North Carolina registered professional <br /> engineer or landscape architect(to the extent that the General Statutes, Chapter <br /> 89A, allow)and submitted to and reviewed by the Erosion Control Officer. <br /> Orange County, North Carolina—Unified Development Ordinance Page 6-112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.