Browse
Search
Agenda - 04-17-2012 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 04-17-2012 - Regular Mtg.
>
Agenda - 04-17-2012 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2015 8:35:29 AM
Creation date
4/13/2012 4:24:33 PM
Metadata
Fields
Template:
BOCC
Date
4/17/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes 04-17-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
ORD-2012-011 Amendments to Unified Development Ordinance (UDO/Zoning 2012-08) – Stormwater
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 2: Procedures 13 <br /> Section 2.21:Stormwater Management <br /> Any disputes over determinations regarding Authorization Certificates shall be referred to <br /> the Division of Water Quality of the North Carolina Department of Environment and <br /> Natural Resources for a decision. <br /> I <br /> • STORMWATER MANAGEMENT <br /> 2.21.1 Stormwater Management Plan <br /> (A) Application Requirements <br /> (1) An application for approval of a Stormwater Management Plan shall be filed with <br /> the Erosion Control Officer on forms provided by the Planning Department. <br /> (B) Plan Requirements <br /> (1) Permanent on-site structural stormwater measures must be shown as part of the <br /> Stormwater Management Plan and must accompany the Land-Disturbing Plan <br /> submittal. Structural stormwater measures are to be in accordance with the NC <br /> DWQ Stormwater BMP Design Manual. <br /> (2) All calculations for Nutrient Export (including the nutrient accounting tool), Peak <br /> Run-off Volume, and permanent structural stormwater measures designed for <br /> Nutrient Removal must be included in the application package. <br /> (3) Structural stormwater measures that are designed, constructed and maintained <br /> in accordance with the NC DWQ Stormwater BMP Design Manual, approved <br /> accounting tool, and requirements listed in Section 6.14 will be presumed to meet <br /> the required performance standards of Section 6.14. Submittals containing <br /> measures not designed to these specifications, may be approved on a case by <br /> case basis provided the applicant provides adequate data and information <br /> showing how the deviations meet the requirements of Section 6.14. <br /> (C) Plan Approval <br /> The Erosion Control Officer is authorized to approve any Stormwater Management Plan <br /> which is in conformance with the performance standards specified in the NC DWQ <br /> Stormwater BMP QFaRge GOURty Design Manual, and other requirements of this <br /> Ordinance. <br /> (D) Approved Plan a Prerequisite <br /> The Erosion Control Officer is not authorized to issue any permits for development on <br /> any land that is defined as new development under Section 6.14 of this Ordinance <br /> unless and until a Stormwater Management Plan in compliance with the requirements of <br /> this Ordinance has been approved. <br /> (E) Design of Permanent Nutrient Export Reduction Structural Stormwater Measures <br /> When a permanent nutrient export reduction structural stormwater measure is required <br /> for new development to meet the requirements of this Ordinance, a North Carolina <br /> registered professional engineer shall prepare the plan with the Engineer's Certification of <br /> Stormwater Management affixed,signed, sealed and dated. <br /> ,SECTION • OCCUPATIONS <br /> 2.22.1 Application Requirements <br /> (A) An application for a Home Occupation Permit shall be filed with the Planning Director on - <br /> forms provided by the Planning Department. <br /> (B) Application forms shall be prepared so that when completed a full and accurate <br /> description of the proposed use, including its location, appearance, and operational <br /> characteristics are disclosed. <br /> Orange County, North Carolina—Unified Development Ordinance Page 2-64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.