Browse
Search
Agenda - 04-17-2012 - 5e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 04-17-2012 - Regular Mtg.
>
Agenda - 04-17-2012 - 5e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2015 8:06:26 AM
Creation date
4/13/2012 4:18:13 PM
Metadata
Fields
Template:
BOCC
Date
4/17/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5e
Document Relationships
2012-193 Solid Waste - Waste Industries - Renewal of Urban Curbside Recycling Services Contract
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2012
Minutes 04-17-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> • 13 <br /> - E <br /> For each quarter ending March 31, June 30, September 30, and December 31, Contractor <br /> shall submit verifiable copies of fuel invoices. The Actual Per Gallon Fuel Cost of diesel <br /> fuel as paid by Contractor shall be determined by computing a straight line average from the <br /> invoices for the quarter in question(total cost of diesel fuel/total gallons of fuel purchased), <br /> and as calculated must be agreed upon by County and Contractor. If and only if the Actual <br /> Per Gallon Fuel Cost for any quarter is either more than one hundred ten percent (110%) or <br /> less than ninety percent (90%) of the Base Line Fuel Cost for that year, then a Fuel Cost <br /> Adjustment shall be made. If the Actual Per Gallon Fuel Cost is neither less than 90% nor <br /> more than 110% of the Base Line Fuel Cost,then no Fuel Cost Adjustment shall be made for <br /> that quarter. <br /> Fuel Cost Adjustments shall be made as follows: <br /> If the Actual Per Gallon Fuel Cost is less than 90%of the Base Line Fuel Cost, the difference <br /> between the Base Line Fuel Cost and the Actual Per Gallon Fuel Cost shall be multiplied by <br /> the Base Line Fuel Usage and then multiplied by three (3) months. The resultant dollar <br /> amount shall be considered the Fuel Cost Adjustment and shown as an itemized credit on the <br /> invoice for service and shall be deducted by County when it pays the invoice. <br /> If the Actual Per Gallon Fuel Cost is more than 110% of the Base Line Fuel Cost, the <br /> difference between the Base Line Fuel Cost and the Actual Per Gallon Fuel Cost shall be <br /> multiplied by the Base Line Fuel Usage and then multiplied by three (3) months. The <br /> resultant dollar amount shall be considered the Fuel Cost Adjustment arid. shown as an <br /> itemized additional charge on the invoice for service, and shall be paid by County as <br /> stipulated in Section 16,Compensation for Services. E <br /> SECTION 5 <br /> Scope of Services <br /> County's Request-for-Statements---of--Qualifrcation-(RFQ),- and Request For Proposal—(RFP) <br /> number 5112, and any associated Addendum, as well as Contractor's Statement of Qualification <br /> and Proposal:dated April 14, 2005, are incorporated herein by reference. Any conflict between <br /> the terms.of.this Contract and the terms of any of the RFQ, the RFP or the April 14, 2005 i <br /> Proposal will be governed by the terms of this Contract. <br /> Contractor shall perform Recycling Collection Services as follows: f <br /> i <br /> Contractor shall collect and remove for marketing or reuse all properly prepared Recyclable <br /> Materials which are placed in or adjacent to approved Recycling Bins at the curb, roadside (in the <br /> case when there is no curb), or other agreed upon location in the case of Handicap / Disabled <br /> collection (for further details about proper preparation of Recyclable Materials, see Section 13 of <br /> this Contract). <br /> Contractor may use whatever collection style deemed beneficial when collecting Recyclable <br /> Materials to the extent that newspaper, magazines, and telephone books must be sorted from the I <br /> Containers at.the curb, and must be transported to the processor in a separate compartment of the <br /> collection vehicle. Contractor may not utilize"Single-Stream"style collection. <br /> 6 i <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.