Browse
Search
2002 NS Housing - Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2002
>
2002 NS Housing - Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2012 9:29:02 AM
Creation date
4/11/2012 9:24:57 AM
Metadata
Fields
Template:
BOCC
Date
8/20/2002
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8m
Document Relationships
Minutes - 20020820
(Supersedes)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />Addie Bradshaw <br />6803 High Rock Rd. <br />Mebane <br />563-3895 <br />April 11, 2002 <br />INTERIOR: <br />LIVIl~TG ROOM: <br />1. Coyer the water stains on the ceiling. Paint the ceiling with ceiling white paint, <br />the door with semigloss latex paint. Paint to cover completely. <br />2. Remove the e~sting door unit and storm door. Install a six panel metal insulated <br />door unit with weather-stripping and aluminum threshold. Install lockset and <br />deadbolt to be keyed the same. Install a wide-angle peephole. <br />3. Reinstall the existing storm door. <br />HITCHEN: <br />1. Remove the kitchen base cabinets on the rear wall, counter top and hot water <br />heater. <br />2. Repair the subfloor and finish floor. <br />3. Install'/a inch lauan plywood. Prepare the plywood for vinyl. <br />4. Install vinyl floor covering, metal trim and shoe mold. Vinyl to cost not less than <br />$14/yd. <br />5. Reinstall the kitchen base cabinets and counter top. <br />HALL: <br />1. Repair the subfloor and finish floor. <br />2. Install'/a inch lauan plywood. Prepare the plywood for vinyl. <br />
The URL can be used to link to this page
Your browser does not support the video tag.