Orange County NC Website
5 <br />Addie Bradshaw <br />6803 High Rock Rd. <br />Mebane <br />563-3895 <br />April ll, 2002 <br />EXTERIOR: <br />1. Prepare the soffitt, fascia, trim, windows, doors, awnings and p~~rch ceiling for <br />paint. Paint those surfaces with at least two coats of exterior seinigloss latex paint. <br />Remove a11 rust from the wrought iron front porch columns. Prime and paint. <br />Paint to cover a11 surfaces completely. <br />2. Install wrought iron handrails on the rear porch and steps. <br />3. Install one replacement foundation vent. <br />4. Install soffitt vents every eight feet in the front and rear soffitt. <br />5. Install four storm windows on the living room windows. <br />ROOF: <br />1. Remove the porch and front section of the living room roof co`~ering to the <br />sheathing. Install 15.1b. felt, aluminum drip edge and three tab ~iberglass shingles. <br />Step flash the shingles against the siding. <br />2. Replace approx. 64 sq. ft. of sheathing. <br />3. Install a shingle type ridge vent ventilation system. <br />4. Remove the turbine vent. Repair the plywood. Install matching shingles. <br />5. Remove the shingles to the sheathing on the left side porch. In;;tall 151b. felt, <br />aluminum drip edge and three tab fiberglass shingles. Step flash the shingles to <br />the siding and brick. <br />