Orange County NC Website
33 <br />Dorothy Riley page 2 <br />222 Collins Ave. <br />Hillsborough, NC 27278 <br />5/O1/02 <br />EXTERIOR CONTINUED: <br />13. Install vinyl solid soffit on the back porch ceiling. <br />14. Cover all facias, eves and overhangs with white coil stock. <br />Repair all rotten wood before installation of coil stock. <br />15. Remove the tin that is covering the damaged asbestos siding at the t~ase <br />of the foundation. <br />16. Remove the exterior window frame on the right/rear corner. Install <br />composite siding to match the existing siding. <br />17. Repair all broken, cracked, and missing asbestos siding. Install composite <br />siding to match the existing asbestos siding. Pressure wash the exte~ior and <br />paint. Paint the siding with at least 2 coats of flat latex paint. Paint to cover <br />completely. Caulk all voids and cracks before painting. <br />18. Install D-5 vinyl siding on the dormer windows and wrap the facias. eves, <br />overhangs and window frames with white coil stock. <br />19. Remove the window in the laundry room. Frame up the opening with 2x4 <br />lumber. Install %z inch plywood over the studs and cover with vinyl siding. <br />Insulate with R-15 insulation and install matching paneling on the iiiside. <br />20. Remove the roof covering from the back section of the house. Repai.r the bottom <br />section of lx6 wood. Cover %z" CD plywood, black felt and matchir.~g 20 year shingles. <br />Insta115V Corrugated metal on the low pitch. Install ridge cap on the hips. <br />21. Install a shingle type ridge ventilation system. <br />22. Install continuous aluminum gutters and downspouts. Install plastic <br />splashblocks under each downspout. <br />23. Prepare the front door frame for paint. Remove all loose paint and prime <br />with an oil primer. Paint the door frame with two (2) coats of white <br />semigloss paint. Paint shall cover completely. <br />