Browse
Search
2002 NS Housing - Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2002
>
2002 NS Housing - Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2012 9:29:02 AM
Creation date
4/11/2012 9:24:57 AM
Metadata
Fields
Template:
BOCC
Date
8/20/2002
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8m
Document Relationships
Minutes - 20020820
(Supersedes)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br />Mary Haith <br />8809 Hannony Church Rd. <br />Mebane, NC 27302 <br />4/2/02 <br />BEDROOM # 1: <br />4. Install new door and window casing to match. Install 3'/a" colonial <br />baseboard. Install new window stools and aprons on the windows. <br />5. Prime the walls and ceiling with new sheetrock primer. Paint the walls and <br />ceiling with flat interior latex paint. Paint the interior of the closet. <br />Paint to cover completely. <br />6. <br />BEDROOM # 2: <br />1. Repair the buckled ceiling tiles. <br />2. Paint the walls and ceiling with flat latex paint. Paint to cover completely. <br />Paint the trim and doors with semigloss latex paint. <br />page 4 <br />3 Frame a 26" x 60" closet. Cover the walls with %2" sheetrock and <br />finish smooth. Install 3'/a" baseboard on the inside and outside of closet. <br />Install a shelf and rod. Install a 4' bifold door unit. Prime and <br />paint the walls with flat latex paint. Prime and paint the trim and doors with <br />semigloss latex paint. Paint to cover completely. <br />4. Install new 1%z" doorstop on the bedroom door. Prime and paint and with <br />semigloss latex paint. Paint to cover completely. <br />HITCHEN PLUMBING: <br />Prime a11 new woodwork with interior latex primer. Prime the existing trim <br />and doors with oil based primer. Paint all trim with semigloss latex paint. <br />Prime and paint the exterior of the closet. Paint to cover completely. <br />Caulk all cracks in trim and molding before painting. <br />Tie the kitchen sink and washing machine drain into the main line leading <br />to the septic tank. Install a mechanical vent under the sink area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.