Browse
Search
2002 NS Housing - Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2002
>
2002 NS Housing - Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2012 9:29:02 AM
Creation date
4/11/2012 9:24:57 AM
Metadata
Fields
Template:
BOCC
Date
8/20/2002
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8m
Document Relationships
Minutes - 20020820
(Supersedes)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br />Cheryl Mitchell <br />112 Eugene St. <br />02/O1/02 <br />928-9912 <br />4. Install an aluminum over wood storm door with pneumatic closure and vinyl <br />sweep. Door to have a self-storing glass and screen, push button lock, key and a <br />lifetime warranty. <br />5. Paint the walls with flat latex paint, the ceiling with ceiling white latex paint and <br />the doors and trim with semigloss latex paint. Paint to cover campletely. <br />6. Install carpet and pad. Carpet to cost not less than $14/yd. <br />Master Bath: <br />l. Paint the walls, ceiling, door and trim with semigloss latex pai~lt. <br />2. Install a five piece accessory kit to include two towel bars, tu~.bler holder, soap <br />dish and paper holder. <br />ELECTRIC: <br />1. Install a 150-amp meter center, mast and weather head. <br />2. Install new outlets, switches and outlet and switch covers. <br />3. Install new fixtures in each room and the exterior entrances. <br />4. Install arc fault breakers for each bedroom. <br />5. Install electric smoke detectors in each bedroom and the hall. <br />6. Install GFI outlets in the kitchen and bath. <br />7. Install a porcelain pull chain fixture in the attic and crawlspace.. <br />9. Install aluminum box extenders on each switch and outlet in t1~e paneled rooms. <br />
The URL can be used to link to this page
Your browser does not support the video tag.