Orange County NC Website
12 <br />Cheryl Mitchell <br />112 Eugene St. <br />02/01 /02 <br />928-9912 <br />3. Install pressure treated 2x8x8 at the center of each set of joists. <br />4. Anchor the deck to the house with 5/8 inch galvanized bolts. <br />5. Install a 2x10 band on the deck with 5/8 inch galvanized bolts. <br />6. Instal14x4 decorative posts, 2x4 rails and 2x2-scalloped pickets. <br />7. Install a 4x4-foot landing on concrete footers on the right hand side of the deck. <br />Install steps, rails and pickets to match the deck. <br />ROOF: <br />1. Remove the shingles to the sheathing. Install 151b. felt, three tab, fiberglass <br />shingles, new plumbing boots and aluminum drip edge. Install flashing and <br />counter flashing on the chimney. <br />2. Replace approx. 64 sq.ft. of sheathing. <br />INTERIOR: <br />Living Room: <br />1. Remove the front door. Reinstall the door unit properly. Install a deadbolt to be <br />keyed the same as the lockset. Install a wide view peephole. Paint the door and <br />door frame with exterior, semigloss latex paint. Pa.int to cover completely. <br />2. Install an aluminum over wood storm door with pneumatic closure and vinyl <br />sweep. Door to have self-storing glass and screen, push button lock, key and a <br />lifetime warranty. <br />