Browse
Search
2002 NS Housing - Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2002
>
2002 NS Housing - Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2012 9:29:02 AM
Creation date
4/11/2012 9:24:57 AM
Metadata
Fields
Template:
BOCC
Date
8/20/2002
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8m
Document Relationships
Minutes - 20020820
(Supersedes)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cheryl Mitchell <br />112 Eugene St. <br />02/O1/02 <br />928-9912 <br />EXTERIOR: <br />1. Scrape and paint the front deck, posts and latticework. Paint to cover completely. <br />2. Install five manually operated foundation vents. <br />3. Remove the over hanging branches from both trees on the left ;~ide of the house. <br />Wor~C to be done by a certified arborist. <br />4. Pressure wash the siding, soffitt, gutter and downspouts with a detergent <br />formulated to clean vinyl siding. <br />5. Install matching vinyl siding, trim, fascia and soffitt on the rea~• addition. <br />6. Remove all trash from the rear of the house including the trash in the storage <br />building. <br />7. Install gutter and downspouts on the rear addition. Install one d.ownspout on the <br />right rear corner of the house. Extend that downspout through the deck. Reinstall <br />the downspout on the right/font corner. Install plastic splashblc~cks under each <br />downspout. <br />8. Install metal, helmet leaf guard system on all gutters. <br />Rear Deck: <br />1. Remove the 4x16 deck on the right side of the house, the railing and 4x6 posts on <br />the main deck. <br />11 <br />2. Brace the deck. Remove the e~cisting 2x8drop girder. Install a ctrop girder on <br />concrete footers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.