Browse
Search
2002 S Purchasing - Owens Roofing Inc Award: Scheduled Roof Replacements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2002
>
2002 S Purchasing - Owens Roofing Inc Award: Scheduled Roof Replacements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2017 12:02:34 PM
Creation date
4/9/2012 2:55:59 PM
Metadata
Fields
Template:
BOCC
Date
6/27/2002
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
8m
Document Relationships
Agenda - 06-27-2002 - 8m
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2002\Agenda - 06-27-2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 1 <br /> THE WORK OF THIS CONTRACT <br /> 1.1 The Contractor shall execute the entire Work described in the Contract Documents,except to the extent specifically indicated <br /> in the Contract Documents to be the responsibility of others, or as follows: <br /> As specified and detailed in project documents prepared by <br /> CTL Engineering dated March 2002. <br /> ARTICLE 2 <br /> DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION <br /> 2.1 The date of commencement is the date from which the Contract Time of Paragraph 2.2 is measured,and shall be the date of this <br /> Agreement,as first written above,unless a different date is stated below or provision is made for the date to be fixed in a notice to pro- <br /> ceed issued by the Owner. <br /> (Insert the date of commencement,if it differs from the date of this agreement or,if applicable,state that the date will be fixed in a notice to proceed) <br /> Date to be fixed in Notice to Proceed. <br /> 2.2 The Contractor shall achieve Substantial Completion of the entire Work not later than <br /> (Insert the calendar date or number of calendar days after the date of commencement.Also insert any requirements for earlier Substantial Completion of certain por- <br /> tions of the Work, if not stated elsewbere in the Contract Documents.) <br /> 90 calendar days after date of Notice to Proceed. <br /> , subject to adjustments of this Contract Time as provided in the Contract Documents. <br /> (Insert provisions, if any,for liquidated damages relating to failure to complete on time.) <br /> Liquidated damages to be assessed at the rate of $200 .00 per day <br /> for each and every day the project remains incomplete beyond <br /> the date specified in Paragraph 2.2 above . <br /> ARTICLE 3 <br /> CONTRACT SUM <br /> 3.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of <br /> One Hundred Forty One Thousand Three Aundre�f d Ninet�r E�nglat Dom <br /> (S 141 ,3S8.00 ,/ J subject to a tions an deaducttons as pro dea.t a Contract <br /> Documents. <br /> AIA DOMMEM A107 a ABBREVIATED OWNER-CONTRACTOR AGREEMENT 0 NINTH EDITION•AIA° •©1987 <br /> THE AMERICAN INSTITUTE OF.ARCHITECTS, 1735 NEW YORK AVENUE,N.W.,WASHINGTON, D.C. 20006 Al 07-1987 2 <br /> WARNING:UnNcomed phowoopong vWatw U.S.copyrW t laws and to sublect to NMA wmecution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.